Penyffordd
PNFWalesManaged by TfW Rail
How this station is performing
Penyffordd had 13,328 scheduled stops to Period 7 of 2026-27, about 37 a day. 81.4% of recorded arrivals were within three minutes of the timetable and 4.1% of scheduled stops were cancelled.
Penyffordd opened on 1 May 1866, 160 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Penyffordd is the oldest; the next oldest, Hope (Flintshire), dates from 1866.
The nearest stations to Penyffordd are Buckley (2.2 km north), Hope (Flintshire) (3.1 km south), Caergwrle (4.1 km south), Hawarden (4.9 km north) and Cefn-y-bedd (5.1 km south). 8 stations lie within 10 km in all. At 81.4%, Penyffordd is more punctual than every one of them; the best of the five, Buckley, manages 80.7%.
Penyffordd takes its name from a Village called Penyffordd, home to about 4,679 people, and the station stands 1.8 km from its centre.
Across the whole run of data, the weakest four-week period for Penyffordd was Period 1 of 2023-24, at 26.5%, some time before the latest year. The strongest was Period 3 of 2024-25, at 90.8%, and the two are 64.3 percentage points apart. Cancellations peaked at 29.3% of scheduled stops in Period 1 of 2023-24, against 4.1% over the latest 13 periods.
Compared with 3 stations of a similar size in Wales, Penyffordd is the most punctual, at 81.4%. The comparison group includes Buckley (80.7%), Caergwrle (78.5%) and Cefn-y-bedd (77.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 13,328 | 81.4% | 4.1% |
Operators with their own page for this station are linked to it.
Late train at Penyffordd? Delay Repay
These operators call at Penyffordd and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,068 | 79.2% | 3.7% |
| Period 6 of 2026-27 | 778 | 78.1% | 5.0% |
| Period 5 of 2026-27 | 801 | 82.1% | 6.5% |
| Period 4 of 2026-27 | 1,068 | 87.0% | 5.1% |
| Period 3 of 2026-27 | 1,068 | 83.5% | 6.8% |
| Period 2 of 2026-27 | 1,068 | 83.6% | 2.9% |
| Period 1 of 2026-27 | 1,232 | 84.0% | 2.6% |
| Period 13 of 2025-26 | 1,171 | 86.1% | 1.5% |
| Period 12 of 2025-26 | 1,068 | 87.9% | 2.8% |
| Period 11 of 2025-26 | 1,000 | 82.3% | 4.1% |
| Period 10 of 2025-26 | 972 | 75.1% | 6.9% |
| Period 9 of 2025-26 | 1,012 | 71.4% | 4.6% |
| Period 8 of 2025-26 | 1,022 | 75.3% | 1.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Buckley | 13,328 | 80.7% | 4.1% |
| Caergwrle | 13,328 | 78.5% | 4.1% |
| Cefn-y-bedd | 13,328 | 77.9% | 4.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out