Staveley (Cumbria)
SVLNorth WestManaged by Northern Trains
How this station is performing
Staveley (Cumbria) has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 10,932 scheduled stops, about 30 a day. In those periods 85.0% of stops arrived within three minutes of the timetable and 2.3% of scheduled stops were cancelled.
Staveley (Cumbria) opened on 21 April 1847, 179 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Kendal is the oldest (1846) and Arnside the newest (1858), with Staveley (Cumbria) in between.
The nearest stations to Staveley (Cumbria) are Burneside (Cumbria) (4.0 km south-east), Windermere (5.5 km west), Kendal (7.1 km south-east), Oxenholme Lake District (10.0 km south-east) and Arnside (19.2 km south). 3 stations lie within 10 km in all. Of the five, Kendal is the most punctual at 86.3% and Oxenholme Lake District the least at 56.2%, with Staveley (Cumbria) on 85.0%.
Staveley (Cumbria) is named after Staveley, a Village, home to about 1,147 people, but the station stands 0.0 km from its centre.
Compared with 3 stations of a similar size in North West, Staveley (Cumbria) is the least punctual, at 85.0%. All of them are ahead, including Burneside (Cumbria) (85.8%), Fairfield (89.1%) and Burscough Junction (89.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 10,932 | 85.0% | 2.3% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 840 | 82.2% | 1.4% |
| Period 6 of 2026-27 | 838 | 84.4% | 1.8% |
| Period 5 of 2026-27 | 840 | 83.9% | 2.3% |
| Period 4 of 2026-27 | 840 | 80.4% | 2.0% |
| Period 3 of 2026-27 | 840 | 82.0% | 4.0% |
| Period 2 of 2026-27 | 840 | 86.5% | 2.7% |
| Period 1 of 2026-27 | 934 | – | 1.8% |
| Period 13 of 2025-26 | 922 | 90.2% | 1.8% |
| Period 12 of 2025-26 | 826 | 85.8% | 1.5% |
| Period 11 of 2025-26 | 818 | 93.0% | 2.1% |
| Period 10 of 2025-26 | 714 | 90.9% | 1.7% |
| Period 9 of 2025-26 | 840 | 82.0% | 2.9% |
| Period 8 of 2025-26 | 840 | 79.6% | 3.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Burneside (Cumbria) | 10,932 | 85.8% | 2.3% |
| Fairfield | 11,161 | 89.1% | 2.2% |
| Burscough Junction | 10,638 | 89.4% | 4.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out