Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Period 13 of 2025-26

Previous periodNext periodAll periods

On time, nationally87.2%A year earlier: 87.8%
Cancelled, nationally2.3%A year earlier: 2.4%
Scheduled stops7,691,306Across Great Britain

How the period went

In Period 13 of 2025-26, 7,691,306 scheduled station stops were recorded across Great Britain. 87.2% of recorded arrivals came within three minutes of the timetable and 2.3% of scheduled stops were cancelled.

Compared with Period 12 of 2025-26, the biggest rises among stations with at least 1,500 scheduled stops were at Kenley (up 16.1 points to 74.7%), Camborne (up 13.2 points to 76.9%), Sunbury (up 13.2 points to 90.9%), Upper Halliford (up 12.7 points to 91.9%) and Kempton Park Racecourse (up 12.1 points to 90.3%).

Compared with Period 12 of 2025-26, the biggest falls were at Warminster (down 7.7 points to 75.4%), Yatton (down 7.6 points to 77.2%), Nailsea and Backwell (down 6.9 points to 79.0%), Clifton Down (down 6.8 points to 81.3%) and Worle (down 6.6 points to 77.1%).

Against the same period a year earlier, Period 13 of 2025-26 brought the biggest improvements at Trehafod (up 12.7 points to 98.2%), Whitchurch (Cardiff) (up 12.6 points to 96.8%), Danescourt (up 12.4 points to 93.4%) and Tonypandy (up 12.4 points to 97.8%).

Against the same period a year earlier, Period 13 of 2025-26 brought the biggest drops at Market Harborough (down 15.6 points to 57.1%), Hall-I'-Th'-Wood (down 15.5 points to 70.0%), Waterbeach (down 15.4 points to 71.8%) and Horwich Parkway (down 13.8 points to 62.3%).

63 stations had their best figure on record in Period 13 of 2025-26; the busiest of them were Cardiff Queen Street (97.0%), Haywards Heath (82.5%), Putney (91.7%), Pontypridd (96.2%) and Radyr (94.6%).

1 stations had their worst figure on record in Period 13 of 2025-26; the busiest of them were Northumberland Park (92.2%).

Least punctual stations

StationScheduled stopsWithin 3 minCancelled
Moses Gate93656.3%7.1%
Market Harborough2,07157.1%6.6%
Penrith (North Lakes)1,88857.4%4.7%
Blackrod1,36857.5%8.8%
Adlington (Lancashire)1,36358.1%9.0%
Kearsley (Manchester)93659.6%7.3%
Manchester Oxford Road10,77160.4%3.8%
Atherstone1,04460.5%5.2%

Most cancellations

StationScheduled stopsWithin 3 minCancelled
Corby2,09081.9%13.4%
Wellingborough2,22676.7%11.0%
Kettering4,18968.0%9.8%
Lostock1,95860.5%9.7%
Buckshaw Parkway2,03661.3%9.6%
Horwich Parkway2,11462.3%9.5%
Chorley2,83361.9%9.4%
Layton (Lancs)1,22582.2%9.4%

Operators

OperatorWithin 3 minCancelled
c2c94.1%1.0%
Heathrow Express92.8%1.7%
Greater Anglia92.3%1.4%
London Overground92.0%2.7%
Merseyrail92.0%1.6%
Chiltern Railways91.6%1.7%
Elizabeth line90.3%2.5%
ScotRail89.7%1.4%
Transport for Wales89.5%1.9%
South Western Railway87.7%2.0%
GTR87.6%3.2%
Southeastern87.6%1.5%
West Midlands Railway85.5%3.1%
Northern82.6%2.4%
Great Western Railway82.2%2.3%
East Midlands Railway77.6%4.2%
TransPennine Express74.1%2.0%
LNER72.7%2.2%
CrossCountry71.0%4.8%
Avanti64.8%4.2%

Areas

AreaWithin 3 minCancelled
London90.3%2.5%
Wales89.9%2.0%
Scotland89.3%1.5%
East of England88.7%2.3%
South East86.5%2.4%
North West83.7%2.6%
West Midlands83.6%3.1%
North East82.8%2.5%
Yorkshire and The Humber81.9%1.4%
South West80.1%2.6%
East Midlands79.7%3.2%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out