Period 13 of 2025-26
Previous periodNext periodAll periods
How the period went
In Period 13 of 2025-26, 7,691,306 scheduled station stops were recorded across Great Britain. 87.2% of recorded arrivals came within three minutes of the timetable and 2.3% of scheduled stops were cancelled.
Compared with Period 12 of 2025-26, the biggest rises among stations with at least 1,500 scheduled stops were at Kenley (up 16.1 points to 74.7%), Camborne (up 13.2 points to 76.9%), Sunbury (up 13.2 points to 90.9%), Upper Halliford (up 12.7 points to 91.9%) and Kempton Park Racecourse (up 12.1 points to 90.3%).
Compared with Period 12 of 2025-26, the biggest falls were at Warminster (down 7.7 points to 75.4%), Yatton (down 7.6 points to 77.2%), Nailsea and Backwell (down 6.9 points to 79.0%), Clifton Down (down 6.8 points to 81.3%) and Worle (down 6.6 points to 77.1%).
Against the same period a year earlier, Period 13 of 2025-26 brought the biggest improvements at Trehafod (up 12.7 points to 98.2%), Whitchurch (Cardiff) (up 12.6 points to 96.8%), Danescourt (up 12.4 points to 93.4%) and Tonypandy (up 12.4 points to 97.8%).
Against the same period a year earlier, Period 13 of 2025-26 brought the biggest drops at Market Harborough (down 15.6 points to 57.1%), Hall-I'-Th'-Wood (down 15.5 points to 70.0%), Waterbeach (down 15.4 points to 71.8%) and Horwich Parkway (down 13.8 points to 62.3%).
63 stations had their best figure on record in Period 13 of 2025-26; the busiest of them were Cardiff Queen Street (97.0%), Haywards Heath (82.5%), Putney (91.7%), Pontypridd (96.2%) and Radyr (94.6%).
1 stations had their worst figure on record in Period 13 of 2025-26; the busiest of them were Northumberland Park (92.2%).
Least punctual stations
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Moses Gate | 936 | 56.3% | 7.1% |
| Market Harborough | 2,071 | 57.1% | 6.6% |
| Penrith (North Lakes) | 1,888 | 57.4% | 4.7% |
| Blackrod | 1,368 | 57.5% | 8.8% |
| Adlington (Lancashire) | 1,363 | 58.1% | 9.0% |
| Kearsley (Manchester) | 936 | 59.6% | 7.3% |
| Manchester Oxford Road | 10,771 | 60.4% | 3.8% |
| Atherstone | 1,044 | 60.5% | 5.2% |
Most cancellations
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Corby | 2,090 | 81.9% | 13.4% |
| Wellingborough | 2,226 | 76.7% | 11.0% |
| Kettering | 4,189 | 68.0% | 9.8% |
| Lostock | 1,958 | 60.5% | 9.7% |
| Buckshaw Parkway | 2,036 | 61.3% | 9.6% |
| Horwich Parkway | 2,114 | 62.3% | 9.5% |
| Chorley | 2,833 | 61.9% | 9.4% |
| Layton (Lancs) | 1,225 | 82.2% | 9.4% |
Operators
| Operator | Within 3 min | Cancelled |
|---|---|---|
| c2c | 94.1% | 1.0% |
| Heathrow Express | 92.8% | 1.7% |
| Greater Anglia | 92.3% | 1.4% |
| London Overground | 92.0% | 2.7% |
| Merseyrail | 92.0% | 1.6% |
| Chiltern Railways | 91.6% | 1.7% |
| Elizabeth line | 90.3% | 2.5% |
| ScotRail | 89.7% | 1.4% |
| Transport for Wales | 89.5% | 1.9% |
| South Western Railway | 87.7% | 2.0% |
| GTR | 87.6% | 3.2% |
| Southeastern | 87.6% | 1.5% |
| West Midlands Railway | 85.5% | 3.1% |
| Northern | 82.6% | 2.4% |
| Great Western Railway | 82.2% | 2.3% |
| East Midlands Railway | 77.6% | 4.2% |
| TransPennine Express | 74.1% | 2.0% |
| LNER | 72.7% | 2.2% |
| CrossCountry | 71.0% | 4.8% |
| Avanti | 64.8% | 4.2% |
Areas
| Area | Within 3 min | Cancelled |
|---|---|---|
| London | 90.3% | 2.5% |
| Wales | 89.9% | 2.0% |
| Scotland | 89.3% | 1.5% |
| East of England | 88.7% | 2.3% |
| South East | 86.5% | 2.4% |
| North West | 83.7% | 2.6% |
| West Midlands | 83.6% | 3.1% |
| North East | 82.8% | 2.5% |
| Yorkshire and The Humber | 81.9% | 1.4% |
| South West | 80.1% | 2.6% |
| East Midlands | 79.7% | 3.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out