Manchester Oxford Road
MCONorth WestManaged by Northern Trains
How this station is performing
Manchester Oxford Road had 129,080 scheduled stops to Period 7 of 2026-27, about 355 a day. 55.5% of recorded arrivals were within three minutes of the timetable and 3.4% of scheduled stops were cancelled.
Manchester Oxford Road opened on 20 July 1849, 177 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Manchester Oxford Road is the newest; the oldest, Salford Central, opened in 1838.
The nearest stations to Manchester Oxford Road are Deansgate (0.6 km west), Manchester Piccadilly (0.9 km north-east), Salford Central (1.3 km north-west), Manchester Victoria (1.6 km north) and Ardwick (1.9 km east). 35 stations lie within 10 km in all. At 55.5%, Manchester Oxford Road is less punctual than all of them; the best of the five, Salford Central, manages 78.5%.
Manchester Oxford Road is named after Manchester, a city status in the United Kingdom, home to about 547,627 people, but the station stands 0.7 km from its centre.
4 operators call at Manchester Oxford Road: Northern (56.2%, 56% of stops), TransPennine Express (53.6%, 27% of stops), Transport for Wales (63.7%, 10% of stops) and East Midlands Railway (44.8%, 7% of stops). The operator you travel with matters: Transport for Wales reaches 63.7% within three minutes while East Midlands Railway manages 44.8%, a gap of 18.9 percentage points.
Compared with 3 stations of a similar size in North West, Manchester Oxford Road is the least punctual, at 55.5%. All of them are ahead, including Liverpool South Parkway (78.1%), Chester (82.8%) and Preston (Lancs) (72.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 71,854 | 56.2% | 3.3% |
| TransPennine Express | 34,377 | 53.6% | 3.9% |
| Transport for Wales | 13,274 | 63.7% | 1.8% |
| East Midlands Railway | 9,575 | 44.8% | 4.9% |
Operators with their own page for this station are linked to it.
Late train at Manchester Oxford Road? Delay Repay
These operators call at Manchester Oxford Road and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 9,747 | 55.2% | 2.6% |
| Period 6 of 2026-27 | 10,110 | 56.1% | 2.6% |
| Period 5 of 2026-27 | 9,809 | 56.4% | 5.3% |
| Period 4 of 2026-27 | 9,804 | 55.3% | 3.6% |
| Period 3 of 2026-27 | 9,809 | 52.1% | 4.3% |
| Period 2 of 2026-27 | 9,487 | 59.6% | 2.9% |
| Period 1 of 2026-27 | 11,324 | 59.9% | 3.0% |
| Period 13 of 2025-26 | 10,771 | 60.4% | 3.8% |
| Period 12 of 2025-26 | 9,548 | 62.3% | 2.2% |
| Period 11 of 2025-26 | 9,875 | 57.6% | 2.0% |
| Period 10 of 2025-26 | 9,105 | 53.0% | 5.1% |
| Period 9 of 2025-26 | 9,898 | 42.0% | 4.0% |
| Period 8 of 2025-26 | 9,793 | 50.5% | 3.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Liverpool South Parkway | 127,803 | 78.1% | 4.0% |
| Chester | 132,487 | 82.8% | 2.8% |
| Preston (Lancs) | 133,423 | 72.8% | 3.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out