Kettering
KETEast MidlandsManaged by East Midlands Railway
How this station is performing
Kettering had 48,309 scheduled stops to Period 7 of 2026-27, about 133 a day. 71.1% of recorded arrivals were within three minutes of the timetable and 6.1% of scheduled stops were cancelled.
Kettering opened on 8 May 1857, 169 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Market Harborough is the oldest (1850) and Long Buckby the newest (1881), with Kettering in between.
Kettering is remote: its nearest neighbours are Wellingborough (10.6 km south), Corby (11.1 km north), Market Harborough (15.4 km north-west), Northampton (21.0 km south-west) and Long Buckby (26.5 km south-west). Of the five, Corby is the most punctual at 83.8% and Market Harborough the least at 59.5%, with Kettering on 71.1%.
Kettering takes its name from a market town called Kettering, home to about 56,226 people, and the station stands 0.7 km from its centre.
Kettering has slipped a little, from 75.7% within three minutes in the previous 13 periods to 71.1% in the latest 13, a fall of 4.6 percentage points. Cancellations rose to 6.1% of scheduled stops from 3.6%, which is 2.5 percentage points more.
2 of 3 stations of a similar size in East Midlands are more punctual than Kettering on 71.1%. The comparison group includes Long Eaton (71.4%), Lincoln (87.8%) and Grantham (64.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 48,308 | 71.1% | 6.1% |
| Hull Trains | 1 | – | – |
Operators with their own page for this station are linked to it.
Late train at Kettering? Delay Repay
These operators call at Kettering and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,587 | 73.2% | 5.3% |
| Period 6 of 2026-27 | 3,401 | 73.2% | 4.6% |
| Period 5 of 2026-27 | 3,260 | 67.0% | 11.3% |
| Period 4 of 2026-27 | 3,627 | 68.7% | 9.2% |
| Period 3 of 2026-27 | 3,406 | 67.4% | 8.3% |
| Period 2 of 2026-27 | 3,755 | 69.6% | 6.2% |
| Period 1 of 2026-27 | 4,347 | 70.7% | 5.5% |
| Period 13 of 2025-26 | 4,189 | 68.0% | 9.8% |
| Period 12 of 2025-26 | 3,813 | 71.8% | 4.9% |
| Period 11 of 2025-26 | 3,816 | 74.6% | 6.4% |
| Period 10 of 2025-26 | 3,503 | 74.4% | 2.8% |
| Period 9 of 2025-26 | 3,812 | 69.8% | 3.7% |
| Period 8 of 2025-26 | 3,793 | 74.6% | 1.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Long Eaton | 49,763 | 71.4% | 3.9% |
| Lincoln | 50,590 | 87.8% | 2.3% |
| Grantham | 54,257 | 64.8% | 2.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out