Atherstone
ATHWest MidlandsManaged by West Midlands Trains (London Northwestern Railway)
How this station is performing
Atherstone had 12,252 scheduled stops to Period 7 of 2026-27, about 34 a day. 51.4% of recorded arrivals were within three minutes of the timetable and 6.5% of scheduled stops were cancelled.
Atherstone opened on 15 September 1847, 179 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Tamworth is the oldest (1839) and Bermuda Park the newest (2016), with Atherstone in between.
The nearest stations to Atherstone are Polesworth (6.6 km north-west), Nuneaton (8.3 km south-east), Wilnecote (Staffs) (9.3 km north-west), Bermuda Park (10.0 km south-east) and Tamworth (11.2 km north-west). 4 stations lie within 10 km in all. At 51.4%, Atherstone is less punctual than all of them; the best of the five, Bermuda Park, manages 88.6%.
Atherstone is one of 2 stations named after a market town called Atherstone, home to about 8,667 people; this one stands 0.4 km from its centre.
Atherstone has slipped sharply. 51.4% of stops came within three minutes of the timetable in the latest 13 periods, 6.4 percentage points worse than the 57.8% recorded in the 13 before. Cancellations held steady at 6.5% of scheduled stops, against 6.2% before.
Compared with 3 stations of a similar size in West Midlands, Atherstone is the least punctual, at 51.4%. All of them are ahead, including Kenilworth (83.4%), Coventry Arena (85.9%) and Bedworth (87.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 12,252 | 51.4% | 6.5% |
Operators with their own page for this station are linked to it.
Late train at Atherstone? Delay Repay
These operators call at Atherstone and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 857 | 52.2% | 2.7% |
| Period 6 of 2026-27 | 948 | 38.6% | 7.6% |
| Period 5 of 2026-27 | 948 | 46.9% | 5.2% |
| Period 4 of 2026-27 | 927 | 44.4% | 12.5% |
| Period 3 of 2026-27 | 939 | 52.9% | 9.1% |
| Period 2 of 2026-27 | 879 | 53.5% | 7.4% |
| Period 1 of 2026-27 | 1,086 | 63.2% | 2.9% |
| Period 13 of 2025-26 | 1,044 | 60.5% | 5.2% |
| Period 12 of 2025-26 | 948 | 53.5% | 4.7% |
| Period 11 of 2025-26 | 948 | 57.1% | 5.4% |
| Period 10 of 2025-26 | 860 | 49.2% | 5.5% |
| Period 9 of 2025-26 | 932 | 45.4% | 7.4% |
| Period 8 of 2025-26 | 936 | 46.7% | 9.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in West Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Kenilworth | 12,253 | 83.4% | 5.5% |
| Coventry Arena | 12,193 | 85.9% | 5.8% |
| Bedworth | 12,133 | 87.9% | 5.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out