Buckshaw Parkway
BSVNorth WestManaged by Northern Trains
How this station is performing
Buckshaw Parkway had 24,535 scheduled stops to Period 7 of 2026-27, about 67 a day. 59.8% of recorded arrivals were within three minutes of the timetable and 4.8% of scheduled stops were cancelled.
Buckshaw Parkway opened on 3 October 2011, 15 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Buckshaw Parkway is the newest; the oldest, Leyland, opened in 1838.
The nearest stations to Buckshaw Parkway are Euxton Balshaw Lane (1.7 km south-west), Chorley (3.1 km south-east), Leyland (3.4 km north-west), Bamber Bridge (6.0 km north) and Lostock Hall (6.0 km north). 9 stations lie within 10 km in all. Of the five, Euxton Balshaw Lane is the most punctual at 84.2% and Chorley the least at 59.4%, with Buckshaw Parkway on 59.8%.
Buckshaw Parkway is a parkway station, 1.2 km from the centre of Buckshaw Village, a Village, home to about 4,000 people, which gives it its name.
2 operators call at Buckshaw Parkway: Northern (59.6%, 99% of stops) and TransPennine Express (90.2%, 1% of stops). The operator you travel with matters: TransPennine Express reaches 90.2% within three minutes while Northern manages 59.6%, a gap of 30.6 percentage points.
Compared with 3 stations of a similar size in North West, Buckshaw Parkway is the least punctual, at 59.8%. All of them are ahead, including Irlam (65.1%), Burnley Manchester Road (71.5%) and Urmston (60.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 24,410 | 59.6% | 4.8% |
| TransPennine Express | 125 | 90.2% | 4.2% |
Operators with their own page for this station are linked to it.
Late train at Buckshaw Parkway? Delay Repay
These operators call at Buckshaw Parkway and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,853 | 59.8% | 4.8% |
| Period 6 of 2026-27 | 1,852 | 62.6% | 3.7% |
| Period 5 of 2026-27 | 1,873 | 60.7% | 5.9% |
| Period 4 of 2026-27 | 1,851 | 58.1% | 4.9% |
| Period 3 of 2026-27 | 1,848 | 57.7% | 6.0% |
| Period 2 of 2026-27 | 1,868 | 63.4% | 3.6% |
| Period 1 of 2026-27 | 2,139 | 63.3% | 3.5% |
| Period 13 of 2025-26 | 2,036 | 61.3% | 9.6% |
| Period 12 of 2025-26 | 1,867 | 64.3% | 2.7% |
| Period 11 of 2025-26 | 1,866 | 64.6% | 2.5% |
| Period 10 of 2025-26 | 1,766 | 60.4% | 7.3% |
| Period 9 of 2025-26 | 1,868 | 46.8% | 5.1% |
| Period 8 of 2025-26 | 1,848 | 53.4% | 2.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Irlam | 24,753 | 65.1% | 4.9% |
| Burnley Manchester Road | 24,282 | 71.5% | 3.2% |
| Urmston | 24,128 | 60.9% | 4.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out