Kearsley (Manchester)
KSLNorth WestManaged by Northern Trains
How this station is performing
Kearsley (Manchester) had 11,318 scheduled stops to Period 7 of 2026-27, about 31 a day. 54.3% of recorded arrivals were within three minutes of the timetable and 3.6% of scheduled stops were cancelled.
Kearsley (Manchester) opened on 29 May 1838, 188 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Kearsley (Manchester) is the oldest; the next oldest, Farnworth, dates from 1838.
The nearest stations to Kearsley (Manchester) are Farnworth (1.1 km north-west), Moses Gate (2.2 km north-west), Walkden (3.0 km south-west), Moorside (3.4 km south-east) and Swinton (Manchester) (4.1 km south-east). 17 stations lie within 10 km in all. Of the five, Moorside is the most punctual at 87.2% and Moses Gate the least at 52.6%, with Kearsley (Manchester) on 54.3%.
Kearsley (Manchester) is named after Kearsley, a town, home to about 14,212 people, but the station stands 1.7 km from its centre.
For Kearsley (Manchester), the weakest four-week period in the data is a recent one: Period 9 of 2025-26, when only 39.3% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2023-24, at 75.3%, which is 36.0 percentage points higher. Cancellations peaked at 11.2% of scheduled stops in Period 4 of 2024-25, against 3.6% over the latest 13 periods.
2 of 3 stations of a similar size in North West are more punctual than Kearsley (Manchester) on 54.3%. The comparison group includes Moses Gate (52.6%), Styal (77.1%) and Congleton (78.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 11,318 | 54.3% | 3.6% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 860 | 53.6% | 1.0% |
| Period 6 of 2026-27 | 864 | 54.0% | 1.6% |
| Period 5 of 2026-27 | 860 | 56.8% | 5.8% |
| Period 4 of 2026-27 | 861 | 53.9% | 4.3% |
| Period 3 of 2026-27 | 853 | 57.0% | 3.4% |
| Period 2 of 2026-27 | 859 | 56.0% | 2.7% |
| Period 1 of 2026-27 | 1,005 | 56.4% | 1.1% |
| Period 13 of 2025-26 | 936 | 59.6% | 7.3% |
| Period 12 of 2025-26 | 860 | 57.2% | 1.9% |
| Period 11 of 2025-26 | 861 | 57.2% | 1.2% |
| Period 10 of 2025-26 | 784 | 54.1% | 7.5% |
| Period 9 of 2025-26 | 859 | 39.3% | 5.0% |
| Period 8 of 2025-26 | 856 | 50.2% | 3.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Moses Gate | 11,310 | 52.6% | 3.5% |
| Styal | 11,278 | 77.1% | 2.3% |
| Congleton | 11,474 | 78.1% | 2.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out