Corby
COREast MidlandsManaged by East Midlands Railway
How this station is performing
Corby had 24,525 scheduled stops to Period 7 of 2026-27, about 67 a day. 83.8% of recorded arrivals were within three minutes of the timetable and 8.1% of scheduled stops were cancelled.
Corby opened on 1 March 1880 and closed to passengers on 18 April 1966. It reopened on 23 February 2009, 17 years before the latest figures. Of the 5 stations nearest to it with a known opening date, Corby is the newest; the oldest, Stamford (Lincs), opened in 1846.
Corby is remote: its nearest neighbours are Kettering (11.1 km south), Market Harborough (15.0 km west), Oakham (20.6 km north), Wellingborough (20.6 km south) and Stamford (Lincs) (22.5 km north-east). At 83.8%, Corby is more punctual than every one of them; the best of the five, Wellingborough, manages 79.2%.
Corby is one of 3 stations named after a new town (UK) called Corby, home to about 62,341 people; this one stands 0.6 km from its centre.
Cancellations are a particular problem at Corby. 8.1% of scheduled stops did not happen, 3.0 times the national median of 2.7%. Ranked from fewest cancellations to most, the station is 2339th of 2,374.
Compared with 3 stations of a similar size in East Midlands, Corby is the most punctual, at 83.8%. The comparison group includes Worksop (83.5%), New Mills Central (82.5%) and Alfreton (71.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 24,525 | 83.8% | 8.1% |
Operators with their own page for this station are linked to it.
Late train at Corby? Delay Repay
These operators call at Corby and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,869 | 83.4% | 7.3% |
| Period 6 of 2026-27 | 1,777 | 83.4% | 6.5% |
| Period 5 of 2026-27 | 1,717 | 79.7% | 17.5% |
| Period 4 of 2026-27 | 1,868 | 83.5% | 8.4% |
| Period 3 of 2026-27 | 1,720 | 83.3% | 7.8% |
| Period 2 of 2026-27 | 1,914 | 84.0% | 7.5% |
| Period 1 of 2026-27 | 2,195 | 83.9% | 6.4% |
| Period 13 of 2025-26 | 2,090 | 81.9% | 13.4% |
| Period 12 of 2025-26 | 1,924 | 84.8% | 6.7% |
| Period 11 of 2025-26 | 1,898 | 85.3% | 9.9% |
| Period 10 of 2025-26 | 1,743 | 86.5% | 5.0% |
| Period 9 of 2025-26 | 1,916 | 83.5% | 6.4% |
| Period 8 of 2025-26 | 1,894 | 85.0% | 3.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Worksop | 25,133 | 83.5% | 2.7% |
| New Mills Central | 23,778 | 82.5% | 1.9% |
| Alfreton | 23,666 | 71.1% | 2.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out