Adlington (Lancashire)
ADLNorth WestManaged by Northern Trains
How this station is performing
Adlington (Lancashire) had 16,285 scheduled stops to Period 7 of 2026-27, about 45 a day. 56.3% of recorded arrivals were within three minutes of the timetable and 5.1% of scheduled stops were cancelled.
Adlington (Lancashire) opened on 4 February 1841, 185 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Adlington (Lancashire) is the oldest; the next oldest, Blackrod, dates from 1841.
The nearest stations to Adlington (Lancashire) are Blackrod (3.3 km south-east), Chorley (4.7 km north), Horwich Parkway (5.7 km south-east), Euxton Balshaw Lane (6.9 km north-west) and Buckshaw Parkway (7.6 km north-west). 13 stations lie within 10 km in all. At 56.3%, Adlington (Lancashire) is less punctual than all of them; the best of the five, Euxton Balshaw Lane, manages 84.2%.
Adlington (Lancashire) is named after Adlington, a town, home to about 6,572 people, but the station stands 0.5 km from its centre.
For Adlington (Lancashire), the weakest four-week period in the data is a recent one: Period 9 of 2025-26, when only 43.5% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2023-24, at 76.9%, which is 33.4 percentage points higher. Cancellations peaked at 13.9% of scheduled stops in Period 10 of 2024-25, against 5.1% over the latest 13 periods.
2 of 3 stations of a similar size in North West are more punctual than Adlington (Lancashire) on 56.3%. The comparison group includes Greenfield (65.9%), Mossley (Manchester) (63.6%) and Blackrod (56.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 16,285 | 56.3% | 5.1% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,236 | 56.3% | 4.6% |
| Period 6 of 2026-27 | 1,236 | 59.3% | 3.6% |
| Period 5 of 2026-27 | 1,240 | 58.4% | 6.2% |
| Period 4 of 2026-27 | 1,240 | 56.0% | 5.2% |
| Period 3 of 2026-27 | 1,233 | 55.8% | 6.3% |
| Period 2 of 2026-27 | 1,240 | 61.7% | 3.9% |
| Period 1 of 2026-27 | 1,426 | 58.7% | 4.3% |
| Period 13 of 2025-26 | 1,363 | 58.1% | 9.0% |
| Period 12 of 2025-26 | 1,243 | 61.1% | 2.8% |
| Period 11 of 2025-26 | 1,227 | 60.1% | 2.7% |
| Period 10 of 2025-26 | 1,121 | 54.0% | 8.5% |
| Period 9 of 2025-26 | 1,244 | 43.5% | 5.5% |
| Period 8 of 2025-26 | 1,236 | 48.5% | 3.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Greenfield | 16,282 | 65.9% | 2.9% |
| Mossley (Manchester) | 16,278 | 63.6% | 2.9% |
| Blackrod | 16,337 | 56.3% | 5.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out