Chorley
CRLNorth WestManaged by Northern Trains
How this station is performing
Chorley had 33,865 scheduled stops to Period 7 of 2026-27, about 93 a day. 59.4% of recorded arrivals were within three minutes of the timetable and 4.6% of scheduled stops were cancelled.
Chorley opened on 22 December 1841, 185 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Leyland is the oldest (1838) and Buckshaw Parkway the newest (2011), with Chorley in between.
The nearest stations to Chorley are Euxton Balshaw Lane (3.0 km west), Buckshaw Parkway (3.1 km north-west), Adlington (Lancashire) (4.7 km south), Leyland (6.5 km north-west) and Blackrod (7.8 km south-east). 7 stations lie within 10 km in all. Of the five, Euxton Balshaw Lane is the most punctual at 84.2% and Adlington (Lancashire) the least at 56.3%, with Chorley on 59.4%.
Chorley is one of 4 stations named after a market town called Chorley, home to about 38,420 people; this one stands 0.3 km from its centre.
2 operators call at Chorley: Northern (59.3%, 99% of stops) and TransPennine Express (81.1%, 1% of stops). The operator you travel with matters: TransPennine Express reaches 81.1% within three minutes while Northern manages 59.3%, a gap of 21.8 percentage points.
Compared with 3 stations of a similar size in North West, Chorley is the least punctual, at 59.4%. All of them are ahead, including Cheadle Hulme (81.7%), Gatley (65.4%) and East Didsbury (65.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 33,609 | 59.3% | 4.6% |
| TransPennine Express | 256 | 81.1% | 4.3% |
Operators with their own page for this station are linked to it.
Late train at Chorley? Delay Repay
These operators call at Chorley and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,583 | 58.1% | 4.1% |
| Period 6 of 2026-27 | 2,584 | 63.6% | 3.3% |
| Period 5 of 2026-27 | 2,605 | 60.3% | 5.7% |
| Period 4 of 2026-27 | 2,561 | 57.6% | 5.2% |
| Period 3 of 2026-27 | 2,581 | 56.3% | 5.5% |
| Period 2 of 2026-27 | 2,600 | 62.8% | 3.5% |
| Period 1 of 2026-27 | 2,958 | 61.8% | 3.6% |
| Period 13 of 2025-26 | 2,833 | 61.9% | 9.4% |
| Period 12 of 2025-26 | 2,580 | 63.6% | 2.6% |
| Period 11 of 2025-26 | 2,549 | 64.5% | 2.0% |
| Period 10 of 2025-26 | 2,262 | 58.8% | 7.4% |
| Period 9 of 2025-26 | 2,589 | 48.6% | 4.5% |
| Period 8 of 2025-26 | 2,580 | 53.8% | 2.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Cheadle Hulme | 33,410 | 81.7% | 2.6% |
| Gatley | 33,030 | 65.4% | 6.7% |
| East Didsbury | 34,972 | 65.8% | 7.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out