Horwich Parkway
HWINorth WestManaged by Transport for Greater Manchester
How this station is performing
Horwich Parkway had 25,565 scheduled stops to Period 7 of 2026-27, about 70 a day. 60.2% of recorded arrivals were within three minutes of the timetable and 4.8% of scheduled stops were cancelled.
Horwich Parkway opened on 30 May 1999, 27 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Horwich Parkway is the newest; the oldest, Blackrod, opened in 1841.
The nearest stations to Horwich Parkway are Blackrod (2.5 km north-west), Westhoughton (2.7 km south-east), Lostock (3.1 km east), Daisy Hill (4.6 km south) and Hindley (4.6 km south-west). 15 stations lie within 10 km in all. Of the five, Daisy Hill is the most punctual at 85.7% and Blackrod the least at 56.3%, with Horwich Parkway on 60.2%.
Horwich Parkway is a parkway station, 1.6 km from the centre of Horwich, a town, home to about 20,690 people, which gives it its name.
2 operators call at Horwich Parkway: Northern (60.0%, 99% of stops) and TransPennine Express (81.6%, 1% of stops). The operator you travel with matters: TransPennine Express reaches 81.6% within three minutes while Northern manages 60.0%, a gap of 21.6 percentage points.
Compared with 3 stations of a similar size in North West, Horwich Parkway is the least punctual, at 60.2%. All of them are ahead, including Warrington West (67.0%), Irlam (65.1%) and Littleborough (70.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 25,310 | 60.0% | 4.8% |
| TransPennine Express | 255 | 81.6% | 4.3% |
Operators with their own page for this station are linked to it.
Late train at Horwich Parkway? Delay Repay
These operators call at Horwich Parkway and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,925 | 60.6% | 4.8% |
| Period 6 of 2026-27 | 1,920 | 63.6% | 3.6% |
| Period 5 of 2026-27 | 1,938 | 62.3% | 5.7% |
| Period 4 of 2026-27 | 1,923 | 59.6% | 4.9% |
| Period 3 of 2026-27 | 1,916 | 58.3% | 6.1% |
| Period 2 of 2026-27 | 1,940 | 64.6% | 3.7% |
| Period 1 of 2026-27 | 2,454 | 64.3% | 3.6% |
| Period 13 of 2025-26 | 2,114 | 62.3% | 9.5% |
| Period 12 of 2025-26 | 1,941 | 64.7% | 2.8% |
| Period 11 of 2025-26 | 1,910 | 62.7% | 2.6% |
| Period 10 of 2025-26 | 1,725 | 58.5% | 7.7% |
| Period 9 of 2025-26 | 1,939 | 45.7% | 4.9% |
| Period 8 of 2025-26 | 1,920 | 54.1% | 2.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Warrington West | 25,273 | 67.0% | 3.8% |
| Irlam | 24,753 | 65.1% | 4.9% |
| Littleborough | 26,523 | 70.2% | 3.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out