Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Period 11 of 2025-26

Previous periodNext periodAll periods

On time, nationally85.7%A year earlier: 83.9%
Cancelled, nationally2.9%A year earlier: 3.5%
Scheduled stops7,084,654Across Great Britain

How the period went

In Period 11 of 2025-26, 7,084,654 scheduled station stops were recorded across Great Britain. 85.7% of recorded arrivals came within three minutes of the timetable and 2.9% of scheduled stops were cancelled.

Compared with Period 10 of 2025-26, the biggest rises among stations with at least 1,500 scheduled stops were at Oxenholme Lake District (up 19.8 points to 70.4%), Taunton (up 17.7 points to 70.7%), Tiverton Parkway (up 16.6 points to 66.9%), Lancaster (up 16.5 points to 73.0%) and Worcestershire Parkway (up 15.9 points to 71.9%).

Compared with Period 10 of 2025-26, the biggest falls were at Roydon (down 8.7 points to 82.2%), Kenley (down 8.5 points to 59.1%), Waterbeach (down 7.6 points to 69.6%), Earlswood (Surrey) (down 6.8 points to 73.3%) and Salfords (Surrey) (down 6.7 points to 74.4%).

Against the same period a year earlier, Period 11 of 2025-26 brought the biggest improvements at Cross Gates (up 21.4 points to 81.5%), Micklefield (up 21.4 points to 76.0%), Dewsbury (up 21.1 points to 73.1%) and East Garforth (up 20.5 points to 81.8%).

Against the same period a year earlier, Period 11 of 2025-26 brought the biggest drops at Kenley (down 17.6 points to 59.1%), Waterbeach (down 14.6 points to 69.6%), Liskeard (down 11.9 points to 73.4%) and St Erth (down 11.4 points to 76.4%).

20 stations had their best figure on record in Period 11 of 2025-26; the busiest of them were Nottingham (84.1%), Beeston (84.4%), Bridgend (78.7%), Long Eaton (79.6%) and Barry (96.0%).

12 stations had their worst figure on record in Period 11 of 2025-26; the busiest of them were Sutton (London) (84.4%), West Croydon (88.4%), Purley (76.7%), Wallington (88.1%) and Carshalton Beeches (88.3%).

Least punctual stations

StationScheduled stopsWithin 3 minCancelled
Axminster92348.4%2.5%
Pitlochry64753.0%3.4%
Crewkerne94754.4%2.1%
Yeovil Junction1,27154.9%3.5%
Moses Gate86155.3%1.3%
Penrith (North Lakes)1,06355.4%1.8%
Atherstone94857.1%5.4%
Kearsley (Manchester)86157.2%1.2%

Most cancellations

StationScheduled stopsWithin 3 minCancelled
Par1,94672.9%12.5%
Paignton2,10088.8%11.9%
Torquay2,10084.2%11.9%
Dawlish2,63080.7%11.8%
Teignmouth2,63080.7%11.8%
Stone (Staffs)93273.0%11.3%
Longport1,04871.0%10.8%
Newton Abbot4,50875.7%10.8%

Operators

OperatorWithin 3 minCancelled
Greater Anglia92.8%0.9%
c2c92.8%0.8%
Heathrow Express91.1%5.2%
Merseyrail90.9%2.5%
Elizabeth line90.5%3.3%
Chiltern Railways90.4%1.3%
London Overground90.1%4.0%
Transport for Wales88.9%3.0%
ScotRail88.6%1.3%
Southeastern86.5%1.3%
West Midlands Railway85.0%5.1%
South Western Railway84.5%2.6%
GTR84.2%3.9%
Great Western Railway81.0%4.6%
Northern80.8%2.4%
East Midlands Railway80.7%3.5%
CrossCountry72.4%5.8%
TransPennine Express72.3%3.9%
LNER69.4%3.4%
Avanti61.2%6.6%

Areas

AreaWithin 3 minCancelled
Wales89.7%2.9%
London88.5%3.1%
Scotland88.3%1.3%
East of England87.5%2.5%
South East83.9%2.7%
West Midlands83.7%4.9%
North East83.4%2.7%
North West82.5%2.8%
East Midlands81.9%2.9%
South West78.6%5.6%
Yorkshire and The Humber78.6%2.5%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out