Crewkerne
CKNSouth WestManaged by South Western Railway
How this station is performing
Crewkerne had 10,966 scheduled stops to Period 7 of 2026-27, about 30 a day. 60.8% of recorded arrivals were within three minutes of the timetable and 1.9% of scheduled stops were cancelled.
Crewkerne opened on 19 July 1860, 166 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Yeovil Pen Mill is the oldest (1856) and Thornford the newest (1936), with Crewkerne in between.
Crewkerne is remote: its nearest neighbours are Yeovil Junction (13.0 km north-east), Yeovil Pen Mill (14.0 km north-east), Chetnole (14.5 km east), Yetminster (14.6 km east) and Thornford (14.6 km east). At 60.8%, Crewkerne is less punctual than all of them; the best of the five, Yeovil Pen Mill, manages 70.8%.
Crewkerne takes its name from a market town called Crewkerne, home to about 7,333 people, and the station stands 1.3 km from its centre.
Crewkerne has slipped sharply. 60.8% of stops came within three minutes of the timetable in the latest 13 periods, 5.5 percentage points worse than the 66.3% recorded in the 13 before. Cancellations held steady at 1.9% of scheduled stops, against 1.8% before.
Compared with 3 stations of a similar size in South West, Crewkerne is the least punctual, at 60.8%. All of them are ahead, including Barnstaple (80.4%), Eggesford (81.1%) and Umberleigh (74.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 10,966 | 60.8% | 1.9% |
Operators with their own page for this station are linked to it.
Late train at Crewkerne? Delay Repay
These operators call at Crewkerne and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 526 | 58.0% | 1.1% |
| Period 6 of 2026-27 | 521 | 60.3% | 1.0% |
| Period 5 of 2026-27 | 780 | 35.9% | 3.6% |
| Period 4 of 2026-27 | 961 | 41.4% | 3.1% |
| Period 3 of 2026-27 | 985 | 62.4% | 1.5% |
| Period 2 of 2026-27 | 1,006 | 59.1% | 2.7% |
| Period 1 of 2026-27 | 1,013 | 60.0% | 1.4% |
| Period 13 of 2025-26 | 1,042 | 68.2% | 0.9% |
| Period 12 of 2025-26 | 1,004 | 78.9% | 2.1% |
| Period 11 of 2025-26 | 947 | 54.4% | 2.1% |
| Period 10 of 2025-26 | 921 | 59.7% | 2.1% |
| Period 9 of 2025-26 | 692 | 66.0% | 0.1% |
| Period 8 of 2025-26 | 568 | 88.8% | 2.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Barnstaple | 10,966 | 80.4% | 4.2% |
| Eggesford | 10,964 | 81.1% | 3.9% |
| Umberleigh | 10,888 | 74.9% | 4.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out