Dawlish
DWLSouth WestManaged by Great Western Railway
How this station is performing
Dawlish had 34,383 scheduled stops to Period 7 of 2026-27, about 94 a day. 76.5% of recorded arrivals were within three minutes of the timetable and 3.8% of scheduled stops were cancelled.
Dawlish opened on 30 May 1846, 180 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Dawlish is the oldest; the next oldest, Teignmouth, dates from 1846.
The nearest stations to Dawlish are Dawlish Warren (2.5 km north-east), Teignmouth (4.2 km south-west), Starcross (5.4 km north), Exmouth (5.7 km north-east) and Lympstone Village (7.9 km north). 7 stations lie within 10 km in all. At 76.5%, Dawlish is less punctual than all of them; the best of the five, Lympstone Village, manages 85.2%.
Dawlish takes its name from a town called Dawlish, home to about 15,264 people, and the station stands 0.1 km from its centre.
2 operators call at Dawlish: Great Western Railway (77.3%, 96% of stops) and CrossCountry (52.2%, 4% of stops). The operator you travel with matters: Great Western Railway reaches 77.3% within three minutes while CrossCountry manages 52.2%, a gap of 25.1 percentage points.
Compared with 3 stations of a similar size in South West, Dawlish is the least punctual, at 76.5%. All of them are ahead, including Teignmouth (76.9%), Lawrence Hill (82.8%) and Stapleton Road (79.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 33,141 | 77.3% | 3.3% |
| CrossCountry | 1,242 | 52.2% | 17.3% |
Operators with their own page for this station are linked to it.
Late train at Dawlish? Delay Repay
These operators call at Dawlish and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,602 | 81.8% | 2.5% |
| Period 6 of 2026-27 | 2,665 | 74.3% | 3.2% |
| Period 5 of 2026-27 | 2,651 | 67.3% | 5.4% |
| Period 4 of 2026-27 | 2,597 | 68.9% | 6.3% |
| Period 3 of 2026-27 | 2,640 | 73.4% | 4.2% |
| Period 2 of 2026-27 | 2,668 | 72.9% | 3.2% |
| Period 1 of 2026-27 | 3,038 | 81.2% | 1.1% |
| Period 13 of 2025-26 | 2,749 | 84.5% | 2.3% |
| Period 12 of 2025-26 | 2,472 | 88.1% | 0.9% |
| Period 11 of 2025-26 | 2,630 | 80.7% | 11.8% |
| Period 10 of 2025-26 | 2,348 | 76.6% | 3.4% |
| Period 9 of 2025-26 | 2,665 | 70.5% | 3.3% |
| Period 8 of 2025-26 | 2,658 | 73.5% | 2.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Teignmouth | 34,383 | 76.9% | 3.8% |
| Lawrence Hill | 34,630 | 82.8% | 4.6% |
| Stapleton Road | 34,630 | 79.2% | 4.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out