Newton Abbot
NTASouth WestManaged by Great Western Railway
How this station is performing
Newton Abbot had 58,484 scheduled stops to Period 7 of 2026-27, about 161 a day. 71.8% of recorded arrivals were within three minutes of the timetable and 4.3% of scheduled stops were cancelled.
Newton Abbot opened on 31 December 1846, 180 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Newton Abbot is the oldest; the next oldest, Teignmouth, dates from 1846.
The nearest stations to Newton Abbot are Torre (7.4 km south-east), Teignmouth (7.6 km east), Torquay (8.7 km south-east), Paignton (10.9 km south) and Dawlish (11.0 km north-east). 3 stations lie within 10 km in all. At 71.8%, Newton Abbot is less punctual than all of them; the best of the five, Paignton, manages 86.5%.
Newton Abbot takes its name from a market town called Newton Abbot, home to about 27,092 people, and the station stands 1.3 km from its centre.
2 operators call at Newton Abbot: Great Western Railway (73.0%, 79% of stops) and CrossCountry (66.8%, 21% of stops). The operator you travel with matters: Great Western Railway reaches 73.0% within three minutes while CrossCountry manages 66.8%, a gap of 6.2 percentage points.
2 of 3 stations of a similar size in South West are more punctual than Newton Abbot on 71.8%. The comparison group includes Gloucester (72.0%), Salisbury (72.0%) and Bath Spa (68.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 46,361 | 73.0% | 3.1% |
| CrossCountry | 12,123 | 66.8% | 8.9% |
Operators with their own page for this station are linked to it.
Late train at Newton Abbot? Delay Repay
These operators call at Newton Abbot and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,426 | 76.8% | 3.4% |
| Period 6 of 2026-27 | 4,566 | 68.9% | 4.5% |
| Period 5 of 2026-27 | 4,567 | 63.1% | 5.8% |
| Period 4 of 2026-27 | 4,575 | 64.5% | 6.5% |
| Period 3 of 2026-27 | 4,559 | 69.0% | 3.8% |
| Period 2 of 2026-27 | 4,569 | 69.5% | 3.2% |
| Period 1 of 2026-27 | 5,176 | 77.2% | 1.6% |
| Period 13 of 2025-26 | 4,461 | 80.6% | 2.8% |
| Period 12 of 2025-26 | 3,990 | 83.5% | 1.3% |
| Period 11 of 2025-26 | 4,508 | 75.7% | 10.8% |
| Period 10 of 2025-26 | 4,031 | 71.7% | 5.4% |
| Period 9 of 2025-26 | 4,555 | 65.2% | 4.2% |
| Period 8 of 2025-26 | 4,501 | 68.1% | 2.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Gloucester | 58,465 | 72.0% | 6.4% |
| Salisbury | 57,872 | 72.0% | 2.9% |
| Bath Spa | 57,295 | 68.5% | 3.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out