Teignmouth
TGMSouth WestManaged by Great Western Railway
How this station is performing
Teignmouth had 34,383 scheduled stops to Period 7 of 2026-27, about 94 a day. 76.9% of recorded arrivals were within three minutes of the timetable and 3.8% of scheduled stops were cancelled.
Teignmouth opened on 30 May 1846. It was moved to the site it uses now on 25 May 1884. Of the 5 stations nearest to it with a known opening date, Teignmouth is the oldest; the next oldest, Dawlish, dates from 1846.
The nearest stations to Teignmouth are Dawlish (4.2 km north-east), Dawlish Warren (6.7 km north-east), Newton Abbot (7.6 km west), Torre (9.1 km south-west) and Starcross (9.5 km north). 6 stations lie within 10 km in all. Of the five, Torre is the most punctual at 82.2% and Newton Abbot the least at 71.8%, with Teignmouth on 76.9%.
Teignmouth takes its name from a town called Teignmouth, home to about 14,933 people, and the station stands 0.1 km from its centre.
2 operators call at Teignmouth: Great Western Railway (77.6%, 96% of stops) and CrossCountry (55.4%, 4% of stops). The operator you travel with matters: Great Western Railway reaches 77.6% within three minutes while CrossCountry manages 55.4%, a gap of 22.2 percentage points.
2 of 3 stations of a similar size in South West are more punctual than Teignmouth on 76.9%. The comparison group includes Dawlish (76.5%), Lawrence Hill (82.8%) and Stapleton Road (79.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 33,141 | 77.6% | 3.3% |
| CrossCountry | 1,242 | 55.4% | 17.2% |
Operators with their own page for this station are linked to it.
Late train at Teignmouth? Delay Repay
These operators call at Teignmouth and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,602 | 81.9% | 2.5% |
| Period 6 of 2026-27 | 2,665 | 74.9% | 3.2% |
| Period 5 of 2026-27 | 2,651 | 67.9% | 5.4% |
| Period 4 of 2026-27 | 2,597 | 69.3% | 6.3% |
| Period 3 of 2026-27 | 2,640 | 74.4% | 4.2% |
| Period 2 of 2026-27 | 2,668 | 73.8% | 3.2% |
| Period 1 of 2026-27 | 3,038 | 81.7% | 1.1% |
| Period 13 of 2025-26 | 2,749 | 84.6% | 2.3% |
| Period 12 of 2025-26 | 2,472 | 87.9% | 0.9% |
| Period 11 of 2025-26 | 2,630 | 80.7% | 11.8% |
| Period 10 of 2025-26 | 2,348 | 76.7% | 3.4% |
| Period 9 of 2025-26 | 2,665 | 71.4% | 3.3% |
| Period 8 of 2025-26 | 2,658 | 73.7% | 2.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Dawlish | 34,383 | 76.5% | 3.8% |
| Lawrence Hill | 34,630 | 82.8% | 4.6% |
| Stapleton Road | 34,630 | 79.2% | 4.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out