Pitlochry
PITScotlandManaged by ScotRail
How this station is performing
Pitlochry had 8,482 scheduled stops to Period 7 of 2026-27, about 23 a day. 63.3% of recorded arrivals were within three minutes of the timetable and 1.2% of scheduled stops were cancelled.
Pitlochry opened on 1 June 1863, 163 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Pitlochry is the newest; the oldest, Perth, opened in 1848.
The nearest stations to Pitlochry are Blair Atholl (9.8 km north-west), Dunkeld and Birnam (18.9 km south-east), Perth (39.1 km south-east), Dalwhinnie (40.4 km north-west) and Kingussie (46.0 km north-west). 1 stations lie within 10 km in all. Of the five, Perth is the most punctual at 82.7% and Dalwhinnie the least at 53.3%, with Pitlochry on 63.3%.
Pitlochry takes its name from a town called Pitlochry, home to about 2,950 people, and the station stands 0.2 km from its centre.
3 operators call at Pitlochry: ScotRail (64.5%, 84% of stops), LNER (57.3%, 8% of stops) and Caledonian Sleeper (–, 7% of stops). The operator you travel with matters: ScotRail reaches 64.5% within three minutes while LNER manages 57.3%, a gap of 7.2 percentage points.
2 of 3 stations of a similar size in Scotland are more punctual than Pitlochry on 63.3%. The comparison group includes Aviemore (71.4%), Kingussie (61.0%) and Muir of Ord (89.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 7,154 | 64.5% | 1.1% |
| LNER | 710 | 57.3% | 0.7% |
| Caledonian Sleeper | 618 | – | – |
Operators with their own page for this station are linked to it.
Late train at Pitlochry? Delay Repay
These operators call at Pitlochry and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 656 | 57.3% | 1.1% |
| Period 6 of 2026-27 | 656 | 65.4% | 0.6% |
| Period 5 of 2026-27 | 655 | 68.0% | 3.5% |
| Period 4 of 2026-27 | 656 | 63.9% | 0.6% |
| Period 3 of 2026-27 | 653 | 68.3% | 0.2% |
| Period 2 of 2026-27 | 656 | 71.7% | 0.6% |
| Period 1 of 2026-27 | 752 | 70.8% | 1.6% |
| Period 13 of 2025-26 | 722 | 73.5% | 1.1% |
| Period 12 of 2025-26 | 656 | 70.9% | 0.3% |
| Period 11 of 2025-26 | 647 | 53.0% | 3.4% |
| Period 10 of 2025-26 | 562 | 54.5% | 0.4% |
| Period 9 of 2025-26 | 653 | 54.0% | 0.9% |
| Period 8 of 2025-26 | 558 | 44.5% | 1.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Aviemore | 8,654 | 71.4% | 1.2% |
| Kingussie | 8,654 | 61.0% | 1.3% |
| Muir of Ord | 8,743 | 89.2% | 2.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out