Period 8 of 2025-26
Previous periodNext periodAll periods
How the period went
In Period 8 of 2025-26, 7,069,306 scheduled station stops were recorded across Great Britain. 81.4% of recorded arrivals came within three minutes of the timetable and 3.0% of scheduled stops were cancelled.
Compared with Period 7 of 2025-26, the biggest rises among stations with at least 1,500 scheduled stops were at Chelmsford (up 15.6 points to 89.2%), Rochford (up 14.6 points to 83.2%), Ingatestone (up 14.4 points to 90.9%), Hockley (up 13.6 points to 85.3%) and Prittlewell (up 13.3 points to 85.3%).
Compared with Period 7 of 2025-26, the biggest falls were at New Milton (down 15.7 points to 62.0%), Christchurch (down 14.8 points to 63.7%), Wareham (Dorset) (down 14.5 points to 62.1%), Bournemouth (down 14.1 points to 62.0%) and Poole (down 13.8 points to 62.7%).
Against the same period a year earlier, Period 8 of 2025-26 brought the biggest improvements at Renton (up 20.6 points to 73.1%), Headingley (up 18.1 points to 64.4%), Carntyne (up 16.7 points to 81.7%) and Burley Park (up 15.5 points to 60.0%).
Against the same period a year earlier, Period 8 of 2025-26 brought the biggest drops at New Milton (down 15.9 points to 62.0%), Rochford (down 15.0 points to 83.2%), Bentley (South Yorkshire) (down 13.7 points to 70.5%) and Penzance (down 13.3 points to 65.0%).
5 stations had their best figure on record in Period 8 of 2025-26; the busiest of them were Ellesmere Port (96.4%), Eskbank (93.2%), Galashiels (95.5%), Shawfair (94.2%) and Stow (96.4%).
23 stations had their worst figure on record in Period 8 of 2025-26; the busiest of them were Stirling (85.7%), Cambuslang (79.1%), Rutherglen (77.1%), Exhibition Centre (Glasgow) (77.2%) and Bridgeton (79.5%).
Least punctual stations
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Pewsey | 573 | 37.2% | 4.2% |
| Castle Cary | 1,233 | 40.6% | 3.8% |
| Yeoford | 894 | 40.8% | 5.4% |
| Morchard Road | 877 | 41.2% | 5.4% |
| Patricroft | 985 | 42.7% | 5.2% |
| Copplestone | 894 | 43.4% | 5.4% |
| Kingussie | 580 | 43.5% | 1.2% |
| Kingham | 1,090 | 44.1% | 4.4% |
Most cancellations
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Dilton Marsh | 770 | – | 11.4% |
| Ashwell and Morden | 2,506 | 76.6% | 10.4% |
| Atherstone | 936 | 46.7% | 9.5% |
| Baldock | 3,307 | 74.7% | 9.2% |
| Norbiton | 3,496 | 76.5% | 9.2% |
| Betchworth | 666 | 69.4% | 8.9% |
| Hampton Wick | 3,609 | 83.1% | 8.9% |
| Kempton Park Racecourse | 1,186 | 79.4% | 8.8% |
Operators
| Operator | Within 3 min | Cancelled |
|---|---|---|
| Greater Anglia | 90.6% | 2.0% |
| Merseyrail | 90.5% | 2.5% |
| c2c | 90.1% | 1.4% |
| London Overground | 89.0% | 3.4% |
| Elizabeth line | 88.0% | 3.3% |
| Heathrow Express | 87.0% | 2.6% |
| Chiltern Railways | 86.9% | 1.4% |
| ScotRail | 84.3% | 1.8% |
| GTR | 83.2% | 4.3% |
| Transport for Wales | 82.2% | 2.1% |
| Southeastern | 81.9% | 1.5% |
| West Midlands Railway | 78.3% | 3.4% |
| South Western Railway | 77.7% | 4.8% |
| Northern | 73.0% | 2.5% |
| LNER | 72.6% | 1.7% |
| Great Western Railway | 71.9% | 3.5% |
| East Midlands Railway | 71.7% | 1.7% |
| TransPennine Express | 63.5% | 4.2% |
| CrossCountry | 62.5% | 4.2% |
| Avanti | 52.6% | 4.9% |
Areas
| Area | Within 3 min | Cancelled |
|---|---|---|
| London | 86.1% | 3.5% |
| East of England | 85.9% | 2.9% |
| Scotland | 84.0% | 1.9% |
| Wales | 82.9% | 2.3% |
| South East | 78.7% | 3.4% |
| North West | 77.8% | 3.0% |
| West Midlands | 75.5% | 3.2% |
| North East | 75.0% | 2.7% |
| East Midlands | 74.2% | 1.9% |
| Yorkshire and The Humber | 70.8% | 1.8% |
| South West | 70.5% | 3.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out