Hampton Wick
HMWLondonManaged by South Western Railway
How this station is performing
Hampton Wick had 50,933 scheduled stops to Period 7 of 2026-27, about 140 a day. 88.3% of recorded arrivals were within three minutes of the timetable and 5.3% of scheduled stops were cancelled.
Hampton Wick opened on 1 July 1863, 163 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Surbiton is the oldest (1838) and Norbiton the newest (1869), with Hampton Wick in between.
The nearest stations to Hampton Wick are Kingston (0.8 km east), Teddington (1.8 km north-west), Norbiton (2.0 km east), Hampton Court (2.5 km south-west) and Surbiton (2.5 km south). 61 stations lie within 10 km in all. At 88.3%, Hampton Wick is more punctual than every one of them; the best of the five, Teddington, manages 88.0%.
Hampton Wick takes its name from an area of London called Hampton Wick, home to about 10,221 people, and the station stands 0.4 km from its centre.
Across the whole run of data, the weakest four-week period for Hampton Wick was Period 9 of 2024-25, at 63.8%, some time before the latest year. The strongest was Period 2 of 2023-24, at 95.8%, and the two are 32.0 percentage points apart. Cancellations peaked at 11.3% of scheduled stops in Period 1 of 2025-26, against 5.3% over the latest 13 periods.
Compared with 3 stations of a similar size in London, Hampton Wick is the most punctual, at 88.3%. The comparison group includes Carshalton (88.2%), Coulsdon South (78.5%) and Hackbridge (87.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 50,933 | 88.3% | 5.3% |
Operators with their own page for this station are linked to it.
Late train at Hampton Wick? Delay Repay
These operators call at Hampton Wick and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,851 | 91.7% | 3.8% |
| Period 6 of 2026-27 | 3,978 | 90.7% | 4.6% |
| Period 5 of 2026-27 | 3,943 | 88.8% | 3.5% |
| Period 4 of 2026-27 | 4,011 | 90.2% | 3.1% |
| Period 3 of 2026-27 | 4,138 | 88.3% | 8.4% |
| Period 2 of 2026-27 | 4,091 | 85.3% | 8.8% |
| Period 1 of 2026-27 | 4,436 | 91.8% | 3.7% |
| Period 13 of 2025-26 | 4,057 | 92.3% | 2.4% |
| Period 12 of 2025-26 | 3,338 | 87.1% | 8.8% |
| Period 11 of 2025-26 | 3,977 | 89.3% | 3.7% |
| Period 10 of 2025-26 | 3,563 | 87.8% | 5.6% |
| Period 9 of 2025-26 | 3,941 | 79.2% | 5.0% |
| Period 8 of 2025-26 | 3,609 | 83.1% | 8.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Carshalton | 51,001 | 88.2% | 5.4% |
| Coulsdon South | 51,232 | 78.5% | 5.1% |
| Hackbridge | 50,558 | 87.8% | 5.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out