Kempton Park Racecourse
KMPSouth EastManaged by South Western Railway
How this station is performing
Kempton Park Racecourse had 21,017 scheduled stops to Period 7 of 2026-27, about 58 a day. 85.8% of recorded arrivals were within three minutes of the timetable and 4.8% of scheduled stops were cancelled.
Kempton Park Racecourse opened on 18 July 1878, 148 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Feltham is the oldest (1848) and Upper Halliford the newest (1944), with Kempton Park Racecourse in between.
The nearest stations to Kempton Park Racecourse are Sunbury (0.6 km south-west), Upper Halliford (1.7 km south-west), Hampton (London) (2.7 km east), Feltham (3.0 km north) and Shepperton (3.7 km south-west). 42 stations lie within 10 km in all. At 85.8%, Kempton Park Racecourse is less punctual than all of them; the best of the five, Feltham, manages 89.8%.
Across the whole run of data, the weakest four-week period for Kempton Park Racecourse was Period 9 of 2024-25, at 58.6%, some time before the latest year. The strongest was Period 5 of 2023-24, at 96.3%, and the two are 37.7 percentage points apart. Cancellations peaked at 11.0% of scheduled stops in Period 3 of 2026-27, against 4.8% over the latest 13 periods.
1 of 3 stations of a similar size in South East are more punctual than Kempton Park Racecourse on 85.8%. The comparison group includes Pluckley (72.8%), Bearsted (81.7%) and Great Missenden (86.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 21,017 | 85.8% | 4.8% |
Operators with their own page for this station are linked to it.
Late train at Kempton Park Racecourse? Delay Repay
These operators call at Kempton Park Racecourse and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,326 | 89.9% | 2.6% |
| Period 6 of 2026-27 | 1,743 | 89.7% | 2.9% |
| Period 5 of 2026-27 | 1,732 | 87.1% | 3.1% |
| Period 4 of 2026-27 | 1,629 | 87.7% | 2.6% |
| Period 3 of 2026-27 | 1,685 | 86.8% | 11.0% |
| Period 2 of 2026-27 | 1,746 | 81.8% | 6.4% |
| Period 1 of 2026-27 | 2,019 | 89.9% | 3.3% |
| Period 13 of 2025-26 | 1,903 | 90.3% | 2.8% |
| Period 12 of 2025-26 | 1,625 | 78.2% | 6.5% |
| Period 11 of 2025-26 | 1,736 | 87.2% | 3.9% |
| Period 10 of 2025-26 | 1,468 | 85.6% | 5.5% |
| Period 9 of 2025-26 | 1,219 | 75.0% | 4.6% |
| Period 8 of 2025-26 | 1,186 | 79.4% | 8.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Pluckley | 20,899 | 72.8% | 1.1% |
| Bearsted | 21,190 | 81.7% | 1.3% |
| Great Missenden | 20,733 | 86.5% | 1.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out