Norbiton
NBTLondonManaged by South Western Railway
How this station is performing
Norbiton had 48,110 scheduled stops to Period 7 of 2026-27, about 132 a day. 85.1% of recorded arrivals were within three minutes of the timetable and 5.7% of scheduled stops were cancelled.
Norbiton opened on 1 January 1869, 157 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Surbiton is the oldest (1838) and Berrylands the newest (1933), with Norbiton in between.
The nearest stations to Norbiton are Kingston (1.2 km west), Berrylands (1.5 km south), Hampton Wick (2.0 km west), New Malden (2.2 km south-east) and Surbiton (2.6 km south-west). 69 stations lie within 10 km in all. Of the five, Hampton Wick is the most punctual at 88.3% and Surbiton the least at 82.9%, with Norbiton on 85.1%.
Norbiton takes its name from an area of London called Norbiton, home to about 10,107 people, and the station stands 0.1 km from its centre.
Across the whole run of data, the weakest four-week period for Norbiton was Period 9 of 2024-25, at 58.5%, some time before the latest year. The strongest was Period 2 of 2023-24, at 95.0%, and the two are 36.5 percentage points apart. Cancellations peaked at 13.1% of scheduled stops in Period 1 of 2025-26, against 5.7% over the latest 13 periods.
Compared with 3 stations of a similar size in London, Norbiton is the least punctual, at 85.1%. All of them are ahead, including New Beckenham (93.5%), Lower Sydenham (93.7%) and Catford Bridge (93.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 48,110 | 85.1% | 5.7% |
Operators with their own page for this station are linked to it.
Late train at Norbiton? Delay Repay
These operators call at Norbiton and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,696 | 88.8% | 4.2% |
| Period 6 of 2026-27 | 3,658 | 89.9% | 4.9% |
| Period 5 of 2026-27 | 3,810 | 87.0% | 3.7% |
| Period 4 of 2026-27 | 3,892 | 87.8% | 3.3% |
| Period 3 of 2026-27 | 3,987 | 85.9% | 8.9% |
| Period 2 of 2026-27 | 3,841 | 82.3% | 9.1% |
| Period 1 of 2026-27 | 4,310 | 89.4% | 3.8% |
| Period 13 of 2025-26 | 3,730 | 90.8% | 2.6% |
| Period 12 of 2025-26 | 3,178 | 83.0% | 9.6% |
| Period 11 of 2025-26 | 3,712 | 85.5% | 3.9% |
| Period 10 of 2025-26 | 3,109 | 82.9% | 6.3% |
| Period 9 of 2025-26 | 3,691 | 73.3% | 5.3% |
| Period 8 of 2025-26 | 3,496 | 76.5% | 9.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| New Beckenham | 47,715 | 93.5% | 1.1% |
| Lower Sydenham | 47,711 | 93.7% | 1.2% |
| Catford Bridge | 47,710 | 93.1% | 1.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out