Betchworth
BTOSouth EastManaged by Great Western Railway
How this station is performing
Betchworth had 8,566 scheduled stops to Period 7 of 2026-27, about 24 a day. 79.2% of recorded arrivals were within three minutes of the timetable and 6.5% of scheduled stops were cancelled.
Betchworth opened on 4 July 1849, 177 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Betchworth is the oldest; the next oldest, Reigate, dates from 1849.
The nearest stations to Betchworth are Dorking (Main) (4.0 km west), Dorking (Deepdene) (4.0 km west), Box Hill and Westhumble (4.3 km west), Reigate (4.5 km east) and Dorking West (5.2 km west). 21 stations lie within 10 km in all. Of the five, Box Hill and Westhumble is the most punctual at 88.0% and Dorking (Deepdene) the least at 77.8%, with Betchworth on 79.2%.
Betchworth takes its name from a Village called Betchworth, home to about 1,060 people, and the station stands 1.6 km from its centre.
Across the whole run of data, the weakest four-week period for Betchworth was Period 9 of 2024-25, at 64.3%, some time before the latest year. The strongest was Period 4 of 2023-24, at 93.6%, and the two are 29.3 percentage points apart. Cancellations peaked at 14.0% of scheduled stops in Period 9 of 2024-25, against 6.5% over the latest 13 periods.
Compared with 3 stations of a similar size in South East, Betchworth is the least punctual, at 79.2%. All of them are ahead, including Dorking West (81.2%), Chilworth (79.8%) and Gomshall (79.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 8,566 | 79.2% | 6.5% |
Operators with their own page for this station are linked to it.
Late train at Betchworth? Delay Repay
These operators call at Betchworth and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 631 | 76.8% | 3.3% |
| Period 6 of 2026-27 | 651 | 75.5% | 10.4% |
| Period 5 of 2026-27 | 672 | 73.9% | 9.2% |
| Period 4 of 2026-27 | 672 | 76.5% | 10.3% |
| Period 3 of 2026-27 | 638 | 79.1% | 8.5% |
| Period 2 of 2026-27 | 667 | 84.4% | 4.6% |
| Period 1 of 2026-27 | 766 | 84.0% | 2.6% |
| Period 13 of 2025-26 | 720 | 88.4% | 2.8% |
| Period 12 of 2025-26 | 668 | 87.2% | 7.3% |
| Period 11 of 2025-26 | 593 | 83.8% | 6.4% |
| Period 10 of 2025-26 | 572 | 78.2% | 7.7% |
| Period 9 of 2025-26 | 650 | 69.6% | 4.0% |
| Period 8 of 2025-26 | 666 | 69.4% | 8.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Dorking West | 8,524 | 81.2% | 6.5% |
| Chilworth | 8,256 | 79.8% | 6.7% |
| Gomshall | 9,038 | 79.6% | 6.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out