Kingham
KGMSouth EastManaged by Great Western Railway
How this station is performing
Kingham has usable figures for 10 of the last 13 four-week periods to Period 7 of 2026-27, covering 14,425 scheduled stops, about 40 a day. In those periods 56.7% of stops arrived within three minutes of the timetable and 4.4% of scheduled stops were cancelled.
Kingham opened on 10 August 1855, 171 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Shipton is the oldest (1853) and Finstock the newest (1934), with Kingham in between.
The nearest stations to Kingham are Shipton (4.7 km south-east), Ascott-under-Wychwood (5.9 km south-east), Charlbury (10.1 km east), Moreton-in-Marsh (11.1 km north-west) and Finstock (12.2 km south-east). 2 stations lie within 10 km in all. Of the five, Charlbury is the most punctual at 60.9% and Moreton-in-Marsh the least at 56.4%, with Kingham on 56.7%.
Kingham takes its name from a Village called Kingham, home to about 969 people, and the station stands 1.0 km from its centre.
Compared with 3 stations of a similar size in South East, Kingham is the least punctual, at 56.7%. All of them are ahead, including Charlbury (60.9%), Bookham (81.7%) and Aylesbury Vale Parkway (91.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 14,425 | 56.7% | 4.4% |
Operators with their own page for this station are linked to it.
Late train at Kingham? Delay Repay
These operators call at Kingham and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,093 | 58.4% | 3.6% |
| Period 6 of 2026-27 | 1,108 | 49.4% | 5.6% |
| Period 5 of 2026-27 | 1,095 | 53.0% | 8.9% |
| Period 4 of 2026-27 | 1,096 | 53.9% | 6.2% |
| Period 3 of 2026-27 | 1,102 | 58.9% | 6.0% |
| Period 2 of 2026-27 | 1,096 | 60.0% | 3.2% |
| Period 1 of 2026-27 | 1,258 | 62.7% | 4.1% |
| Period 13 of 2025-26 | 1,219 | 72.6% | 2.2% |
| Period 12 of 2025-26 | 1,071 | – | 2.3% |
| Period 11 of 2025-26 | 1,100 | – | 2.5% |
| Period 10 of 2025-26 | 1,001 | 46.7% | 5.5% |
| Period 9 of 2025-26 | 1,096 | – | 3.5% |
| Period 8 of 2025-26 | 1,090 | 44.1% | 4.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Charlbury | 14,429 | 60.9% | 4.4% |
| Bookham | 14,516 | 81.7% | 3.1% |
| Aylesbury Vale Parkway | 14,290 | 91.0% | 2.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out