Kingussie
KINScotlandManaged by ScotRail
How this station is performing
Kingussie had 8,654 scheduled stops to Period 7 of 2026-27, about 24 a day. 61.0% of recorded arrivals were within three minutes of the timetable and 1.3% of scheduled stops were cancelled.
Kingussie opened on 9 September 1863, 163 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Kingussie is the oldest; the next oldest, Newtonmore, dates from 1863.
The nearest stations to Kingussie are Newtonmore (4.5 km south-west), Aviemore (18.3 km north-east), Dalwhinnie (19.7 km south-west), Carrbridge (26.2 km north-east) and Blair Atholl (36.9 km south). 1 stations lie within 10 km in all. Of the five, Aviemore is the most punctual at 71.4% and Dalwhinnie the least at 53.3%, with Kingussie on 61.0%.
Kingussie takes its name from a town called Kingussie, home to about 1,480 people, and the station stands 0.3 km from its centre.
3 operators call at Kingussie: ScotRail (60.5%, 85% of stops), LNER (59.2%, 8% of stops) and Caledonian Sleeper (–, 7% of stops). They are close together, with ScotRail leading on 60.5% and LNER trailing on 59.2%, a gap of 1.3 percentage points.
Compared with 3 stations of a similar size in Scotland, Kingussie is the least punctual, at 61.0%. All of them are ahead, including Aviemore (71.4%), Muir of Ord (89.2%) and Dingwall (87.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 7,326 | 60.5% | 1.1% |
| LNER | 710 | 59.2% | 0.7% |
| Caledonian Sleeper | 618 | – | – |
Operators with their own page for this station are linked to it.
Late train at Kingussie? Delay Repay
These operators call at Kingussie and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 656 | 50.4% | 0.9% |
| Period 6 of 2026-27 | 656 | 62.9% | 0.6% |
| Period 5 of 2026-27 | 655 | 61.7% | 3.5% |
| Period 4 of 2026-27 | 656 | 56.5% | 0.6% |
| Period 3 of 2026-27 | 653 | 64.9% | 0.2% |
| Period 2 of 2026-27 | 668 | 66.7% | 0.6% |
| Period 1 of 2026-27 | 778 | 70.2% | 2.1% |
| Period 13 of 2025-26 | 746 | 71.8% | 1.1% |
| Period 12 of 2025-26 | 680 | 71.3% | 0.4% |
| Period 11 of 2025-26 | 671 | 57.6% | 3.3% |
| Period 10 of 2025-26 | 581 | 56.1% | 0.3% |
| Period 9 of 2025-26 | 674 | 53.5% | 1.2% |
| Period 8 of 2025-26 | 580 | 43.5% | 1.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Aviemore | 8,654 | 71.4% | 1.2% |
| Muir of Ord | 8,743 | 89.2% | 2.7% |
| Dingwall | 8,760 | 87.1% | 2.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out