Castle Cary
CLCSouth WestManaged by Great Western Railway
How this station is performing
Castle Cary had 15,993 scheduled stops to Period 7 of 2026-27, about 44 a day. 57.2% of recorded arrivals were within three minutes of the timetable and 4.1% of scheduled stops were cancelled.
Castle Cary opened on 1 September 1856, 170 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Castle Cary is the oldest; the next oldest, Bruton, dates from 1856.
The nearest stations to Castle Cary are Bruton (5.4 km east), Templecombe (13.2 km south-east), Sherborne (17.3 km south), Yeovil Pen Mill (18.4 km south) and Gillingham (Dorset) (19.0 km south-east). 1 stations lie within 10 km in all. At 57.2%, Castle Cary is less punctual than all of them; the best of the five, Yeovil Pen Mill, manages 70.8%.
Castle Cary takes its name from a market town called Castle Cary, home to about 2,411 people, and the station stands 1.4 km from its centre.
2 operators call at Castle Cary: Great Western Railway (54.0%, 85% of stops) and South Western Railway (77.1%, 15% of stops). The operator you travel with matters: South Western Railway reaches 77.1% within three minutes while Great Western Railway manages 54.0%, a gap of 23.1 percentage points.
Compared with 3 stations of a similar size in South West, Castle Cary is the least punctual, at 57.2%. All of them are ahead, including Highbridge and Burnham (72.8%), Parson Street (75.7%) and Marsh Barton (79.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 13,652 | 54.0% | 3.5% |
| South Western Railway | 2,341 | 77.1% | 7.8% |
Operators with their own page for this station are linked to it.
Late train at Castle Cary? Delay Repay
These operators call at Castle Cary and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,170 | 64.0% | 3.3% |
| Period 6 of 2026-27 | 1,241 | 53.3% | 3.0% |
| Period 5 of 2026-27 | 1,248 | 48.5% | 4.1% |
| Period 4 of 2026-27 | 1,267 | 50.6% | 5.1% |
| Period 3 of 2026-27 | 1,243 | 54.4% | 6.4% |
| Period 2 of 2026-27 | 1,243 | 56.9% | 5.5% |
| Period 1 of 2026-27 | 1,335 | 64.6% | 2.3% |
| Period 13 of 2025-26 | 1,353 | 68.8% | 2.7% |
| Period 12 of 2025-26 | 1,227 | 71.3% | 1.6% |
| Period 11 of 2025-26 | 1,217 | 67.0% | 5.6% |
| Period 10 of 2025-26 | 985 | 56.6% | 4.4% |
| Period 9 of 2025-26 | 1,231 | 45.4% | 6.2% |
| Period 8 of 2025-26 | 1,233 | 40.6% | 3.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Highbridge and Burnham | 15,728 | 72.8% | 2.9% |
| Parson Street | 15,705 | 75.7% | 3.2% |
| Marsh Barton | 15,656 | 79.7% | 2.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out