Period 5 of 2025-26
Previous periodNext periodAll periods
How the period went
In Period 5 of 2025-26, 7,062,579 scheduled station stops were recorded across Great Britain. 85.4% of recorded arrivals came within three minutes of the timetable and 3.4% of scheduled stops were cancelled.
Compared with Period 4 of 2025-26, the biggest rises among stations with at least 1,500 scheduled stops were at Haslemere (up 16.7 points to 77.9%), Godalming (up 12.3 points to 83.7%), Farncombe (up 11.4 points to 85.3%), Kenley (up 11.4 points to 79.2%) and Winchester (up 11.3 points to 76.9%).
Compared with Period 4 of 2025-26, the biggest falls were at Ingatestone (down 12.3 points to 78.4%), Chelmsford (down 12.1 points to 77.7%), Wilmslow (down 9.0 points to 62.8%), Billericay (down 8.6 points to 85.3%) and Eskbank (down 7.8 points to 80.6%).
Against the same period a year earlier, Period 5 of 2025-26 brought the biggest improvements at Tonypandy (up 20.4 points to 97.3%), Whitchurch (Cardiff) (up 19.1 points to 93.7%), Llwynypia (up 16.9 points to 97.4%) and Trehafod (up 16.1 points to 96.8%).
Against the same period a year earlier, Period 5 of 2025-26 brought the biggest drops at Chelmsford (down 15.9 points to 77.7%), Ingatestone (down 15.4 points to 78.4%), Bentley (South Yorkshire) (down 14.8 points to 72.4%) and Pembrey and Burry Port (down 14.6 points to 65.3%).
31 stations had their best figure on record in Period 5 of 2025-26; the busiest of them were Whitechapel (95.3%), Canada Water (96.2%), Shadwell (96.7%), Shoreditch High Street (96.6%) and Surrey Quays (96.2%).
6 stations had their worst figure on record in Period 5 of 2025-26; the busiest of them were Bishopstone (Sussex) (83.7%), Seaford (Sussex) (83.4%), Windsor and Eton Riverside (84.1%), Allens West (81.9%) and Longbeck (84.3%).
Least punctual stations
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Watlington | 1,351 | 42.7% | 6.4% |
| Downham Market | 1,355 | 43.8% | 6.1% |
| Kings Lynn | 1,355 | 47.8% | 6.4% |
| Honiton | 956 | 48.9% | 2.5% |
| Littleport | 1,355 | 50.0% | 6.1% |
| Axminster | 956 | 52.2% | 2.4% |
| Yeovil Junction | 1,333 | 52.3% | 4.3% |
| Atherstone | 923 | 52.8% | 6.1% |
Most cancellations
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Ifield | 1,991 | 81.7% | 14.0% |
| Morden South | 1,836 | – | 13.9% |
| South Merton | 1,836 | 87.0% | 13.9% |
| St Helier (London) | 1,836 | – | 13.9% |
| Wimbledon Chase | 1,836 | 88.0% | 13.8% |
| Sutton Common | 1,836 | – | 13.7% |
| West Sutton | 1,836 | 87.4% | 13.7% |
| Haydons Road | 1,897 | 89.8% | 13.4% |
Operators
| Operator | Within 3 min | Cancelled |
|---|---|---|
| Elizabeth line | 93.3% | 2.2% |
| Heathrow Express | 93.3% | 2.1% |
| London Overground | 92.7% | 3.2% |
| Greater Anglia | 91.7% | 1.0% |
| c2c | 91.7% | 1.3% |
| Merseyrail | 90.2% | 2.2% |
| ScotRail | 88.4% | 3.2% |
| Chiltern Railways | 87.9% | 1.5% |
| Southeastern | 86.7% | 1.9% |
| GTR | 85.7% | 6.3% |
| South Western Railway | 85.3% | 4.0% |
| Transport for Wales | 84.6% | 2.4% |
| West Midlands Railway | 83.7% | 2.9% |
| Great Western Railway | 78.8% | 3.1% |
| Northern | 78.3% | 3.8% |
| East Midlands Railway | 74.7% | 3.2% |
| LNER | 68.5% | 3.6% |
| TransPennine Express | 68.0% | 3.7% |
| CrossCountry | 66.7% | 4.2% |
| Avanti | 58.9% | 2.9% |
Areas
| Area | Within 3 min | Cancelled |
|---|---|---|
| London | 90.5% | 3.7% |
| Scotland | 88.1% | 3.2% |
| East of England | 87.0% | 3.6% |
| Wales | 85.0% | 2.4% |
| South East | 84.0% | 3.5% |
| West Midlands | 81.4% | 2.5% |
| North West | 81.0% | 3.2% |
| North East | 77.0% | 4.2% |
| East Midlands | 76.5% | 2.7% |
| Yorkshire and The Humber | 76.0% | 3.7% |
| South West | 75.8% | 3.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out