Haydons Road
HYRLondonManaged by Govia Thameslink Railway (Thameslink)
How this station is performing
Haydons Road had 23,753 scheduled stops to Period 7 of 2026-27, about 65 a day. 83.8% of recorded arrivals were within three minutes of the timetable and 8.9% of scheduled stops were cancelled.
Haydons Road opened on 1 October 1868, 158 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Wimbledon is the oldest (1838) and South Merton the newest (1929), with Haydons Road in between.
The nearest stations to Haydons Road are Wimbledon (1.2 km west), Earlsfield (1.9 km north), Tooting (2.0 km east), Wimbledon Chase (2.5 km south-west) and South Merton (2.7 km south-west). 88 stations lie within 10 km in all. Of the five, Wimbledon Chase is the most punctual at 84.3% and Earlsfield the least at 81.2%, with Haydons Road on 83.8%.
Haydons Road has slipped sharply. 83.8% of stops came within three minutes of the timetable in the latest 13 periods, 5.0 percentage points worse than the 88.8% recorded in the 13 before. Cancellations held steady at 8.9% of scheduled stops, against 9.2% before.
1 of 3 stations of a similar size in London are more punctual than Haydons Road on 83.8%. The comparison group includes Tooting (82.6%), South Merton (83.0%) and West Sutton (84.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 23,753 | 83.8% | 8.9% |
Operators with their own page for this station are linked to it.
Late train at Haydons Road? Delay Repay
These operators call at Haydons Road and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,916 | 77.2% | 6.1% |
| Period 6 of 2026-27 | 1,907 | 74.8% | 10.0% |
| Period 5 of 2026-27 | 1,920 | 74.1% | 12.7% |
| Period 4 of 2026-27 | 1,972 | 84.8% | 6.3% |
| Period 3 of 2026-27 | 1,622 | 83.3% | 9.6% |
| Period 2 of 2026-27 | 1,634 | 88.5% | 5.4% |
| Period 1 of 2026-27 | 2,026 | 88.3% | 7.0% |
| Period 13 of 2025-26 | 1,854 | 90.5% | 7.3% |
| Period 12 of 2025-26 | 1,966 | 87.5% | 6.5% |
| Period 11 of 2025-26 | 1,899 | 83.7% | 9.3% |
| Period 10 of 2025-26 | 1,395 | 87.2% | 14.1% |
| Period 9 of 2025-26 | 1,792 | 82.4% | 15.1% |
| Period 8 of 2025-26 | 1,850 | 87.5% | 7.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Tooting | 23,754 | 82.6% | 8.8% |
| South Merton | 23,713 | 83.0% | 9.2% |
| West Sutton | 23,713 | 84.8% | 9.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out