Watlington
WTGEast of EnglandManaged by Govia Thameslink Railway (Great Northern)
How this station is performing
Watlington had 17,138 scheduled stops to Period 7 of 2026-27, about 47 a day. 62.7% of recorded arrivals were within three minutes of the timetable and 10.0% of scheduled stops were cancelled.
Watlington opened on 27 October 1846 and closed to passengers on 9 September 1968. It reopened on 5 May 1975, 51 years before the latest figures. Of the 5 stations nearest to it with a known opening date, Watlington is the oldest; the next oldest, Downham Market, dates from 1846.
The nearest stations to Watlington are Downham Market (7.7 km south), Kings Lynn (9.2 km north), March (23.3 km south-west), Littleport (23.8 km south) and Manea (23.9 km south-west). 2 stations lie within 10 km in all. At 62.7%, Watlington is less punctual than all of them; the best of the five, March, manages 67.4%.
Watlington is one of 2 stations named after a Village called Watlington, home to about 2,594 people; this one stands 0.7 km from its centre.
Watlington has slipped sharply. 62.7% of stops came within three minutes of the timetable in the latest 13 periods, 10.4 percentage points worse than the 73.1% recorded in the 13 before. Cancellations rose to 10.0% of scheduled stops from 6.8%, which is 3.2 percentage points more.
Compared with 3 stations of a similar size in East of England, Watlington is the least punctual, at 62.7%. All of them are ahead, including Littleport (65.2%), Downham Market (64.2%) and Kings Lynn (65.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 17,138 | 62.7% | 10.0% |
Operators with their own page for this station are linked to it.
Late train at Watlington? Delay Repay
These operators call at Watlington and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,254 | 50.7% | 8.4% |
| Period 6 of 2026-27 | 1,408 | 58.1% | 24.4% |
| Period 5 of 2026-27 | 1,299 | 63.2% | 14.4% |
| Period 4 of 2026-27 | 1,392 | 49.9% | 17.3% |
| Period 3 of 2026-27 | 1,295 | 63.5% | 9.5% |
| Period 2 of 2026-27 | 1,176 | 57.2% | 10.0% |
| Period 1 of 2026-27 | 1,327 | 64.4% | 7.4% |
| Period 13 of 2025-26 | 1,518 | 65.5% | 7.1% |
| Period 12 of 2025-26 | 1,419 | 67.0% | 5.9% |
| Period 11 of 2025-26 | 1,416 | 61.4% | 6.8% |
| Period 10 of 2025-26 | 1,178 | 70.8% | 4.8% |
| Period 9 of 2025-26 | 1,356 | 73.3% | 8.0% |
| Period 8 of 2025-26 | 1,100 | 68.3% | 4.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East of England
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Littleport | 17,147 | 65.2% | 9.9% |
| Downham Market | 17,149 | 64.2% | 10.0% |
| Kings Lynn | 17,260 | 65.1% | 9.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out