Period 3 of 2025-26
Previous periodNext periodAll periods
How the period went
In Period 3 of 2025-26, 7,072,696 scheduled station stops were recorded across Great Britain. 86.1% of recorded arrivals came within three minutes of the timetable and 2.8% of scheduled stops were cancelled.
Compared with Period 2 of 2025-26, the biggest rises among stations with at least 1,500 scheduled stops were at Huddersfield (up 13.7 points to 76.1%), Shawfair (up 9.3 points to 90.5%), Tweedbank (up 8.5 points to 90.6%), Stalybridge (up 8.4 points to 78.5%) and Eskbank (up 8.2 points to 90.3%).
Compared with Period 2 of 2025-26, the biggest falls were at Worcestershire Parkway (down 13.5 points to 61.0%), Bentley (South Yorkshire) (down 12.7 points to 71.8%), Adwick (down 12.6 points to 73.2%), Outwood (down 11.0 points to 68.9%) and Sowerby Bridge (down 10.8 points to 53.5%).
Against the same period a year earlier, Period 3 of 2025-26 brought the biggest improvements at Llanishen (up 15.3 points to 91.2%), Heath High Level (up 15.0 points to 92.4%), Radyr (up 14.6 points to 92.6%) and Trefforest (up 13.6 points to 93.2%).
Against the same period a year earlier, Period 3 of 2025-26 brought the biggest drops at Bentley (South Yorkshire) (down 16.4 points to 71.8%), Adwick (down 15.1 points to 73.2%), Haslemere (down 14.5 points to 71.1%) and Outwood (down 13.7 points to 68.9%).
43 stations had their best figure on record in Period 3 of 2025-26; the busiest of them were London Waterloo East (93.2%), London Charing Cross (91.9%), Romford (95.0%), York (76.7%) and Seven Kings (94.2%).
6 stations had their worst figure on record in Period 3 of 2025-26; the busiest of them were Highams Park (90.2%), Blackhorse Road (91.5%), Crouch Hill (91.9%), Harringay Green Lanes (89.4%) and South Tottenham (91.2%).
Least punctual stations
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Lockerbie | 1,011 | 52.8% | 7.7% |
| Crianlarich | 502 | 53.0% | 1.0% |
| Sowerby Bridge | 2,265 | 53.5% | 3.3% |
| Mytholmroyd | 1,985 | 55.0% | 3.1% |
| Penrith (North Lakes) | 1,782 | 55.2% | 6.3% |
| Atherstone | 685 | 55.7% | 9.6% |
| Hebden Bridge | 3,873 | 56.1% | 2.9% |
| Oxenholme Lake District | 2,965 | 58.3% | 5.0% |
Most cancellations
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Ifield | 1,990 | 82.7% | 12.3% |
| Littlehaven | 2,115 | 82.3% | 11.6% |
| Watlington | 1,356 | 84.1% | 11.4% |
| Downham Market | 1,358 | 84.7% | 11.3% |
| Littleport | 1,358 | 83.8% | 11.2% |
| Kings Lynn | 1,358 | 85.1% | 10.9% |
| Earlswood (Surrey) | 2,166 | 80.1% | 10.4% |
| Harlington (Bedfordshire) | 3,615 | 82.2% | 10.2% |
Operators
| Operator | Within 3 min | Cancelled |
|---|---|---|
| c2c | 94.4% | 1.2% |
| Elizabeth line | 93.7% | 1.8% |
| Greater Anglia | 93.5% | 1.2% |
| ScotRail | 90.9% | 1.3% |
| Heathrow Express | 90.8% | 4.2% |
| London Overground | 90.6% | 4.1% |
| Merseyrail | 90.6% | 2.0% |
| Southeastern | 88.6% | 1.5% |
| Chiltern Railways | 87.7% | 1.8% |
| GTR | 85.6% | 4.6% |
| Transport for Wales | 85.0% | 2.7% |
| West Midlands Railway | 84.0% | 2.5% |
| South Western Railway | 83.8% | 3.0% |
| Great Western Railway | 80.8% | 3.3% |
| Northern | 80.1% | 2.9% |
| East Midlands Railway | 76.6% | 2.8% |
| LNER | 76.4% | 1.1% |
| TransPennine Express | 74.2% | 2.3% |
| CrossCountry | 66.9% | 5.9% |
| Avanti | 60.1% | 3.3% |
Areas
| Area | Within 3 min | Cancelled |
|---|---|---|
| Scotland | 90.6% | 1.4% |
| London | 89.7% | 3.2% |
| East of England | 88.8% | 3.0% |
| Wales | 85.6% | 2.9% |
| South East | 84.6% | 3.0% |
| North West | 82.4% | 3.0% |
| North East | 81.8% | 2.0% |
| West Midlands | 81.1% | 2.7% |
| East Midlands | 79.3% | 2.8% |
| South West | 78.5% | 3.1% |
| Yorkshire and The Humber | 78.0% | 1.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out