Littlehaven
LVNSouth EastManaged by Govia Thameslink Railway (Southern)
How this station is performing
Littlehaven had 27,787 scheduled stops to Period 7 of 2026-27, about 76 a day. 79.1% of recorded arrivals were within three minutes of the timetable and 6.8% of scheduled stops were cancelled.
Littlehaven opened on 1 June 1907, 119 years before the latest figures here, and has not been moved since. The First World War closed Littlehaven on 1 January 1917, and it reopened on 3 May 1920. Of the 5 stations nearest to it with a known opening date, Littlehaven is the newest; the oldest, Horsham, opened in 1848.
The nearest stations to Littlehaven are Horsham (1.7 km south-west), Warnham (2.1 km north-west), Faygate (3.6 km north-east), Christs Hospital (5.0 km south-west) and Ifield (7.7 km north-east). 7 stations lie within 10 km in all. Of the five, Ifield is the most punctual at 80.9% and Horsham the least at 72.6%, with Littlehaven on 79.1%.
Cancellations are a particular problem at Littlehaven. 6.8% of scheduled stops did not happen, 2.5 times the national median of 2.7%. Ranked from fewest cancellations to most, the station is 2308th of 2,374.
1 of 3 stations of a similar size in South East are more punctual than Littlehaven on 79.1%. The comparison group includes East Grinstead (88.9%), Pevensey and Westham (76.6%) and Salfords (Surrey) (77.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 27,787 | 79.1% | 6.8% |
Operators with their own page for this station are linked to it.
Late train at Littlehaven? Delay Repay
These operators call at Littlehaven and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,138 | 75.9% | 4.8% |
| Period 6 of 2026-27 | 2,083 | 69.5% | 7.7% |
| Period 5 of 2026-27 | 2,069 | 73.6% | 10.5% |
| Period 4 of 2026-27 | 2,116 | 76.9% | 8.8% |
| Period 3 of 2026-27 | 2,107 | 77.3% | 9.3% |
| Period 2 of 2026-27 | 2,061 | 84.5% | 8.0% |
| Period 1 of 2026-27 | 2,464 | 87.6% | 6.6% |
| Period 13 of 2025-26 | 2,334 | 86.3% | 2.4% |
| Period 12 of 2025-26 | 2,152 | 79.8% | 5.0% |
| Period 11 of 2025-26 | 2,164 | 80.2% | 4.4% |
| Period 10 of 2025-26 | 1,854 | 81.7% | 6.6% |
| Period 9 of 2025-26 | 2,127 | 72.6% | 9.6% |
| Period 8 of 2025-26 | 2,118 | 79.4% | 5.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Grinstead | 27,766 | 88.9% | 3.2% |
| Pevensey and Westham | 27,811 | 76.6% | 4.9% |
| Salfords (Surrey) | 27,825 | 77.4% | 8.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out