Harlington (Bedfordshire)
HLNEast of EnglandManaged by Govia Thameslink Railway (Thameslink)
How this station is performing
Harlington (Bedfordshire) had 51,716 scheduled stops to Period 7 of 2026-27, about 142 a day. 84.6% of recorded arrivals were within three minutes of the timetable and 6.1% of scheduled stops were cancelled.
Harlington (Bedfordshire) opened on 13 July 1868, 158 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Lidlington is the oldest (1846) and Flitwick the newest (1870), with Harlington (Bedfordshire) in between.
The nearest stations to Harlington (Bedfordshire) are Flitwick (4.7 km north), Leagrave (6.7 km south), Lidlington (9.9 km north-west), Ridgmont (9.9 km north-west) and Luton (10.4 km south-east). 4 stations lie within 10 km in all. Of the five, Lidlington is the most punctual at 93.9% and Luton the least at 80.1%, with Harlington (Bedfordshire) on 84.6%.
Harlington (Bedfordshire) is named after Harlington, a Village, home to about 2,322 people, but the station stands 0.2 km from its centre.
Cancellations are a particular problem at Harlington (Bedfordshire). 6.1% of scheduled stops did not happen, 2.3 times the national median of 2.7%. Ranked from fewest cancellations to most, the station is 2256th of 2,374.
2 of 3 stations of a similar size in East of England are more punctual than Harlington (Bedfordshire) on 84.6%. The comparison group includes Carpenders Park (86.9%), Watford High Street (86.6%) and Leighton Buzzard (75.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 51,716 | 84.6% | 6.1% |
Operators with their own page for this station are linked to it.
Late train at Harlington (Bedfordshire)? Delay Repay
These operators call at Harlington (Bedfordshire) and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,151 | 82.9% | 4.3% |
| Period 6 of 2026-27 | 4,047 | 79.7% | 7.1% |
| Period 5 of 2026-27 | 3,996 | 78.8% | 9.6% |
| Period 4 of 2026-27 | 3,964 | 80.1% | 8.2% |
| Period 3 of 2026-27 | 2,851 | 86.5% | 4.6% |
| Period 2 of 2026-27 | 3,641 | 88.4% | 3.9% |
| Period 1 of 2026-27 | 4,418 | 89.3% | 3.8% |
| Period 13 of 2025-26 | 4,518 | 86.7% | 3.8% |
| Period 12 of 2025-26 | 4,164 | 87.3% | 6.8% |
| Period 11 of 2025-26 | 4,114 | 85.5% | 5.8% |
| Period 10 of 2025-26 | 3,740 | 87.3% | 6.1% |
| Period 9 of 2025-26 | 4,082 | 81.4% | 10.0% |
| Period 8 of 2025-26 | 4,030 | 85.6% | 4.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East of England
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Carpenders Park | 51,431 | 86.9% | 3.3% |
| Watford High Street | 51,430 | 86.6% | 3.3% |
| Leighton Buzzard | 50,908 | 75.7% | 4.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out