Earlswood (Surrey) had 27,727 scheduled stops to Period 7 of 2026-27, about 76 a day. 76.2% of recorded arrivals were within three minutes of the timetable and 8.5% of scheduled stops were cancelled.
Earlswood (Surrey) opened on 1 August 1868, 158 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Redhill is the oldest (1841) and Salfords (Surrey) the newest (1932), with Earlswood (Surrey) in between.
The nearest stations to Earlswood (Surrey) are Redhill (1.4 km north), Nutfield (2.7 km east), Reigate (2.7 km north-west), Salfords (Surrey) (3.0 km south) and Merstham (4.3 km north). 13 stations lie within 10 km in all. At 76.2%, Earlswood (Surrey) is less punctual than all of them; the best of the five, Nutfield, manages 82.5%.
Earlswood (Surrey) is named after Earlswood, a suburb, home to about 5,049 people, but the station stands 0.0 km from its centre.
Cancellations are a particular problem at Earlswood (Surrey). 8.5% of scheduled stops did not happen, 3.1 times the national median of 2.7%. Ranked from fewest cancellations to most, the station is 2346th of 2,374.
Compared with 3 stations of a similar size in South East, Earlswood (Surrey) is the least punctual, at 76.2%. All of them are ahead, including Higham (84.1%), Box Hill and Westhumble (88.0%) and East Grinstead (88.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 27,727 | 76.2% | 8.5% |
Operators with their own page for this station are linked to it.
Late train at Earlswood (Surrey)? Delay Repay
These operators call at Earlswood (Surrey) and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,212 | 75.4% | 6.6% |
| Period 6 of 2026-27 | 2,126 | 69.3% | 10.7% |
| Period 5 of 2026-27 | 2,010 | 65.7% | 11.8% |
| Period 4 of 2026-27 | 2,152 | 72.3% | 13.1% |
| Period 3 of 2026-27 | 1,898 | 75.0% | 5.1% |
| Period 2 of 2026-27 | 2,175 | 82.4% | 5.1% |
| Period 1 of 2026-27 | 2,468 | 82.7% | 4.9% |
| Period 13 of 2025-26 | 2,416 | 83.3% | 4.2% |
| Period 12 of 2025-26 | 2,215 | 78.7% | 12.1% |
| Period 11 of 2025-26 | 1,888 | 73.3% | 7.8% |
| Period 10 of 2025-26 | 1,819 | 80.1% | 10.1% |
| Period 9 of 2025-26 | 2,204 | 71.1% | 14.3% |
| Period 8 of 2025-26 | 2,144 | 76.7% | 5.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Higham | 27,745 | 84.1% | 4.6% |
| Box Hill and Westhumble | 27,706 | 88.0% | 3.6% |
| East Grinstead | 27,766 | 88.9% | 3.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out