Sowerby Bridge
SOWYorkshire and The HumberManaged by Northern Trains
How this station is performing
Sowerby Bridge had 29,267 scheduled stops to Period 7 of 2026-27, about 80 a day. 58.6% of recorded arrivals were within three minutes of the timetable and 2.6% of scheduled stops were cancelled.
Sowerby Bridge opened on 5 October 1840, 186 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Sowerby Bridge is the oldest; the next oldest, Hebden Bridge, dates from 1840.
The nearest stations to Sowerby Bridge are Halifax (3.8 km east), Mytholmroyd (5.4 km north-west), Hebden Bridge (7.5 km north-west), Brighouse (8.5 km east) and Slaithwaite (9.5 km south). 5 stations lie within 10 km in all. At 58.6%, Sowerby Bridge is less punctual than all of them; the best of the five, Brighouse, manages 76.2%.
Sowerby Bridge takes its name from a market town called Sowerby Bridge, home to about 11,703 people, and the station stands 0.9 km from its centre.
2 operators call at Sowerby Bridge: Northern (58.5%, 93% of stops) and TransPennine Express (60.7%, 7% of stops). They are close together, with TransPennine Express leading on 60.7% and Northern trailing on 58.5%, a gap of 2.2 percentage points.
Compared with 3 stations of a similar size in Yorkshire and The Humber, Sowerby Bridge is the least punctual, at 58.6%. All of them are ahead, including Swinton (South Yorks) (78.0%), Brighouse (76.2%) and Rotherham Central (77.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 27,237 | 58.5% | 2.6% |
| TransPennine Express | 2,030 | 60.7% | 2.4% |
Operators with their own page for this station are linked to it.
Late train at Sowerby Bridge? Delay Repay
These operators call at Sowerby Bridge and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,211 | 53.1% | 1.2% |
| Period 6 of 2026-27 | 2,339 | 65.6% | 1.9% |
| Period 5 of 2026-27 | 2,348 | 65.5% | 2.8% |
| Period 4 of 2026-27 | 2,176 | 63.2% | 2.6% |
| Period 3 of 2026-27 | 2,237 | 59.6% | 1.7% |
| Period 2 of 2026-27 | 2,272 | 51.8% | 2.9% |
| Period 1 of 2026-27 | 2,533 | 66.1% | 2.5% |
| Period 13 of 2025-26 | 2,439 | 64.5% | 1.7% |
| Period 12 of 2025-26 | 2,203 | 57.4% | 1.6% |
| Period 11 of 2025-26 | 2,204 | 57.8% | 2.1% |
| Period 10 of 2025-26 | 2,069 | 60.5% | 4.4% |
| Period 9 of 2025-26 | 2,096 | 45.6% | 5.0% |
| Period 8 of 2025-26 | 2,140 | 47.7% | 3.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Swinton (South Yorks) | 30,218 | 78.0% | 2.4% |
| Brighouse | 30,485 | 76.2% | 2.5% |
| Rotherham Central | 30,742 | 77.6% | 3.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out