Hebden Bridge
HBDYorkshire and The HumberManaged by Northern Trains
How this station is performing
Hebden Bridge had 49,610 scheduled stops to Period 7 of 2026-27, about 136 a day. 60.2% of recorded arrivals were within three minutes of the timetable and 2.5% of scheduled stops were cancelled.
Hebden Bridge opened on 5 October 1840, 186 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Hebden Bridge is the oldest; the next oldest, Todmorden, dates from 1840.
The nearest stations to Hebden Bridge are Mytholmroyd (2.0 km south-east), Todmorden (6.5 km south-west), Sowerby Bridge (7.5 km south-east), Walsden (7.8 km south-west) and Halifax (10.4 km east). 4 stations lie within 10 km in all. Of the five, Walsden is the most punctual at 74.8% and Sowerby Bridge the least at 58.6%, with Hebden Bridge on 60.2%.
Hebden Bridge takes its name from a market town called Hebden Bridge, and the station stands 0.5 km from its centre.
2 operators call at Hebden Bridge: Northern (60.2%, 96% of stops) and TransPennine Express (61.1%, 4% of stops). They are close together, with TransPennine Express leading on 61.1% and Northern trailing on 60.2%, a gap of 0.9 percentage points.
Compared with 3 stations of a similar size in Yorkshire and The Humber, Hebden Bridge is the least punctual, at 60.2%. All of them are ahead, including Todmorden (63.2%), New Pudsey (70.9%) and Barnsley (78.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 47,563 | 60.2% | 2.5% |
| TransPennine Express | 2,047 | 61.1% | 2.3% |
Operators with their own page for this station are linked to it.
Late train at Hebden Bridge? Delay Repay
These operators call at Hebden Bridge and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,779 | 56.2% | 1.3% |
| Period 6 of 2026-27 | 3,891 | 67.0% | 2.0% |
| Period 5 of 2026-27 | 3,907 | 66.7% | 2.8% |
| Period 4 of 2026-27 | 3,713 | 64.7% | 2.7% |
| Period 3 of 2026-27 | 3,695 | 61.8% | 1.9% |
| Period 2 of 2026-27 | 3,832 | 54.6% | 2.6% |
| Period 1 of 2026-27 | 4,347 | 67.9% | 2.6% |
| Period 13 of 2025-26 | 4,137 | 66.5% | 1.9% |
| Period 12 of 2025-26 | 3,767 | 58.2% | 1.6% |
| Period 11 of 2025-26 | 3,765 | 62.3% | 2.4% |
| Period 10 of 2025-26 | 3,484 | 62.2% | 4.1% |
| Period 9 of 2025-26 | 3,657 | 43.9% | 4.3% |
| Period 8 of 2025-26 | 3,636 | 47.9% | 2.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Todmorden | 49,080 | 63.2% | 2.8% |
| New Pudsey | 51,400 | 70.9% | 3.3% |
| Barnsley | 46,768 | 78.0% | 1.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out