Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Period 1 of 2024-25

Previous periodNext periodAll periods

On time, nationally87.7%A year earlier: 88.2%
Cancelled, nationally2.7%A year earlier: 2.6%
Scheduled stops6,487,392Across Great Britain

How the period went

In Period 1 of 2024-25, 6,487,392 scheduled station stops were recorded across Great Britain. 87.7% of recorded arrivals came within three minutes of the timetable and 2.7% of scheduled stops were cancelled.

Compared with Period 13 of 2023-24, the biggest rises among stations with at least 1,500 scheduled stops were at Severn Tunnel Junction (up 15.2 points to 75.9%), Newbury (up 12.4 points to 83.1%), Chippenham (up 11.8 points to 74.9%), Truro (up 11.4 points to 84.0%) and Newport (South Wales) (up 11.0 points to 73.8%).

Compared with Period 13 of 2023-24, the biggest falls were at Dewsbury (down 10.0 points to 63.4%), Burton-on-Trent (down 9.2 points to 62.3%), Newton-le-Willows (down 8.5 points to 71.2%), Hilsea (down 8.1 points to 79.6%) and Emsworth (down 8.1 points to 78.0%).

Against the same period a year earlier, Period 1 of 2024-25 brought the biggest improvements at London Blackfriars (up 21.9 points to 82.2%), London Paddington (up 20.6 points to 88.8%), Warwick Parkway (up 20.6 points to 92.9%) and Warwick (up 17.9 points to 94.3%).

Against the same period a year earlier, Period 1 of 2024-25 brought the biggest drops at Avonmouth (down 13.5 points to 73.2%), Folkestone West (down 11.4 points to 76.0%), Todmorden (down 10.9 points to 67.0%) and Oxenholme Lake District (down 10.9 points to 63.0%).

52 stations had their best figure on record in Period 1 of 2024-25; the busiest of them were London Paddington (88.8%), Stourbridge Junction (97.3%), Purley (89.0%), London Marylebone (95.5%) and Brent Cross West (85.2%).

Least punctual stations

StationScheduled stopsWithin 3 minCancelled
Lockerbie83751.2%2.0%
Penrith (North Lakes)1,37555.1%3.0%
Newtown (Powys)63357.3%2.7%
Deighton60457.8%1.2%
Pewsey53157.9%4.5%
Caersws63358.8%2.7%
Ravensthorpe76859.0%1.4%
Worcestershire Parkway1,43959.7%5.5%

Most cancellations

StationScheduled stopsWithin 3 minCancelled
Hook1,65893.1%10.0%
Winchfield1,65892.0%9.8%
Bentley (Hampshire)1,23892.2%9.7%
Leagrave3,51887.3%9.6%
Alton1,62292.9%9.4%
Harlington (Bedfordshire)3,38286.6%9.4%
Brookwood3,28193.0%9.1%
Earlswood (Surrey)1,86784.6%9.1%

Operators

OperatorWithin 3 minCancelled
Greater Anglia94.3%2.1%
Chiltern Railways94.2%0.7%
London Overground92.7%3.5%
c2c92.4%1.9%
Elizabeth line92.2%1.3%
Merseyrail91.8%2.4%
ScotRail90.6%1.9%
South Western Railway89.0%3.7%
Heathrow Express88.6%1.9%
Southeastern88.4%1.1%
GTR87.8%4.1%
West Midlands Railway85.8%3.1%
Transport for Wales84.0%3.0%
Northern82.7%2.6%
Great Western Railway82.4%3.1%
East Midlands Railway78.8%1.7%
LNER76.0%1.9%
TransPennine Express73.0%1.9%
CrossCountry72.8%3.6%
Avanti64.2%5.9%

Areas

AreaWithin 3 minCancelled
London91.3%2.8%
Scotland90.3%1.9%
East of England89.8%3.1%
South East86.5%3.0%
North West85.2%2.8%
Wales84.4%3.2%
West Midlands84.2%2.6%
North East83.0%2.2%
South West81.4%3.8%
East Midlands80.2%1.7%
Yorkshire and The Humber79.2%2.1%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out