On time, last 13 periods –Great Britain: 83.6%
Cancelled –Great Britain: 3.2%
Stops a day 0Scheduled, on average
Punctuality rank Not rankedAmong ranked stations
Save this station How this station is performing There are not enough usable punctuality records for Deighton in the 13 four-week periods to Period 7 of 2026-27 to say how punctual its trains are.
Period by period 40% 60% 80% 2023-24 2024-25 2025-26 2026-27 Period 1 of 2023-24: 69.1% Period 2 of 2023-24: 66.0% Period 3 of 2023-24: 67.5% Period 4 of 2023-24: 60.7% Period 5 of 2023-24: 60.0% Period 6 of 2023-24: 56.2% Period 7 of 2023-24: 52.8% Period 8 of 2023-24: 45.1% Period 9 of 2023-24: 36.0% Period 10 of 2023-24: 50.4% Period 11 of 2023-24: 54.2% Period 12 of 2023-24: 59.8% Period 13 of 2023-24: 64.5% Period 1 of 2024-25: 57.8% Period 2 of 2024-25: 59.3% Period 3 of 2024-25: 60.3% Period 4 of 2024-25: 58.0% Period 5 of 2024-25: 57.2% Period 6 of 2024-25: 55.2% Period 7 of 2024-25: 55.4% Period 8 of 2024-25: 47.8% Period 9 of 2024-25: 41.6% Period 10 of 2024-25: 56.3% Period 11 of 2024-25: 55.9% Period 12 of 2024-25: 59.6% Period 13 of 2024-25: 71.3% Period 1 of 2025-26: 58.5% Period 2 of 2025-26: 58.3% Period 3 of 2025-26: 66.7% Period 4 of 2025-26: 55.2% Period 5 of 2025-26: 60.8% Period 6 of 2025-26: 64.0% This page Great Britain 0% 2% 4% 6% Period 1 of 2023-24: 1.8% Period 2 of 2023-24: 3.3% Period 3 of 2023-24: 3.5% Period 4 of 2023-24: 3.4% Period 5 of 2023-24: 5.4% Period 6 of 2023-24: 1.6% Period 7 of 2023-24: 2.5% Period 8 of 2023-24: 2.9% Period 9 of 2023-24: 5.0% Period 10 of 2023-24: 1.9% Period 11 of 2023-24: 1.6% Period 12 of 2023-24: 0.9% Period 13 of 2023-24: 0.4% Period 1 of 2024-25: 1.2% Period 2 of 2024-25: 1.3% Period 3 of 2024-25: 1.3% Period 4 of 2024-25: 4.1% Period 5 of 2024-25: 3.0% Period 6 of 2024-25: 3.9% Period 7 of 2024-25: 0.7% Period 8 of 2024-25: 0.4% Period 9 of 2024-25: 3.6% Period 10 of 2024-25: 4.9% Period 11 of 2024-25: 2.4% Period 12 of 2024-25: 1.6% Period 13 of 2024-25: 0.6% Period 1 of 2025-26: 1.6% Period 2 of 2025-26: 2.1% Period 3 of 2025-26: 1.5% Period 4 of 2025-26: 4.0% Period 5 of 2025-26: 1.1% Period 6 of 2025-26: 1.6% 2023-24 2024-25 2025-26 2026-27 Time of year 40% 60% 80% P1: 62.2% 1 P2: 60.7% 2 P3: 64.2% 3 P4: 57.2% 4 P5: 59.4% 5 P6: 58.2% 6 P7: 54.5% 7 P8: 46.5% 8 P9: 39.0% 9 P10: 53.9% 10 P11: 55.1% 11 P12: 59.7% 12 P13: 68.5% 13 Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out