Alton
AONSouth EastManaged by South Western Railway
How this station is performing
Alton had 23,694 scheduled stops to Period 7 of 2026-27, about 65 a day. 85.0% of recorded arrivals were within three minutes of the timetable and 3.1% of scheduled stops were cancelled.
Alton opened on 28 July 1852. It was moved to the site it uses now on 2 October 1865. Among the 5 stations nearest to it with a known opening date, Farnham is the oldest (1849) and Hook the newest (1883), with Alton in between.
The nearest stations to Alton are Bentley (Hampshire) (7.7 km north-east), Liss (13.1 km south-east), Farnham (13.9 km north-east), Hook (14.2 km north) and Liphook (14.7 km south-east). 1 stations lie within 10 km in all. Of the five, Hook is the most punctual at 87.8% and Liphook the least at 77.5%, with Alton on 85.0%.
Alton is one of 3 stations named after a town called Alton, home to about 19,429 people; this one stands 0.7 km from its centre.
Alton has slipped sharply. 85.0% of stops came within three minutes of the timetable in the latest 13 periods, 6.0 percentage points worse than the 91.0% recorded in the 13 before. Cancellations rose to 3.1% of scheduled stops from 2.5%, which is 0.6 percentage points more.
2 of 3 stations of a similar size in South East are more punctual than Alton on 85.0%. The comparison group includes Andover (74.8%), Halling (95.0%) and New Hythe (95.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 23,694 | 85.0% | 3.1% |
Operators with their own page for this station are linked to it.
Late train at Alton? Delay Repay
These operators call at Alton and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,803 | 82.9% | 2.9% |
| Period 6 of 2026-27 | 1,672 | 76.3% | 2.3% |
| Period 5 of 2026-27 | 1,860 | 74.2% | 4.5% |
| Period 4 of 2026-27 | 1,799 | 77.2% | 2.3% |
| Period 3 of 2026-27 | 1,713 | 80.0% | 5.3% |
| Period 2 of 2026-27 | 1,852 | 83.0% | 9.6% |
| Period 1 of 2026-27 | 2,142 | 90.5% | 2.5% |
| Period 13 of 2025-26 | 2,002 | 92.9% | 0.9% |
| Period 12 of 2025-26 | 1,758 | 91.4% | 1.9% |
| Period 11 of 2025-26 | 1,801 | 92.0% | 0.3% |
| Period 10 of 2025-26 | 1,601 | 88.6% | 3.7% |
| Period 9 of 2025-26 | 1,823 | 86.7% | 2.0% |
| Period 8 of 2025-26 | 1,868 | 86.4% | 2.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out