Worcestershire Parkway
WOPWest MidlandsManaged by Great Western Railway
How this station is performing
Worcestershire Parkway has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 32,360 scheduled stops, about 89 a day. In those periods 61.9% of stops arrived within three minutes of the timetable and 6.1% of scheduled stops were cancelled.
Worcestershire Parkway opened on 23 February 2020, 6 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Worcestershire Parkway is the newest; the oldest, Worcester Shrub Hill, opened in 1850.
The nearest stations to Worcestershire Parkway are Worcester Shrub Hill (5.5 km north-west), Worcester Foregate Street (6.0 km north-west), Pershore (6.6 km south-east), Malvern Link (11.4 km west) and Great Malvern (12.0 km south-west). 3 stations lie within 10 km in all. Of the five, Worcester Foregate Street is the most punctual at 76.0% and Pershore the least at 57.8%, with Worcestershire Parkway on 61.9%.
2 operators call at Worcestershire Parkway: CrossCountry (62.1%, 56% of stops) and Great Western Railway (59.4%, 44% of stops). They are close together, with CrossCountry leading on 62.1% and Great Western Railway trailing on 59.4%, a gap of 2.7 percentage points.
Compared with 3 stations of a similar size in West Midlands, Worcestershire Parkway is the least punctual, at 61.9%. All of them are ahead, including Tyseley (92.4%), Rugeley Trent Valley (77.6%) and Hereford (74.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| CrossCountry | 18,247 | 62.1% | 7.8% |
| Great Western Railway | 14,113 | 59.4% | 4.0% |
Operators with their own page for this station are linked to it.
Late train at Worcestershire Parkway? Delay Repay
These operators call at Worcestershire Parkway and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,404 | 58.9% | 6.2% |
| Period 6 of 2026-27 | 2,516 | 54.4% | 7.5% |
| Period 5 of 2026-27 | 2,394 | 53.4% | 6.8% |
| Period 4 of 2026-27 | 2,499 | 54.0% | 6.8% |
| Period 3 of 2026-27 | 2,405 | 61.2% | 6.9% |
| Period 2 of 2026-27 | 2,504 | 61.9% | 7.2% |
| Period 1 of 2026-27 | 2,898 | 66.5% | 3.8% |
| Period 13 of 2025-26 | 2,751 | 70.5% | 3.2% |
| Period 12 of 2025-26 | 2,436 | 75.0% | 2.9% |
| Period 11 of 2025-26 | 2,430 | 71.9% | 4.7% |
| Period 10 of 2025-26 | 2,248 | 56.0% | 10.2% |
| Period 9 of 2025-26 | 2,472 | – | 8.7% |
| Period 8 of 2025-26 | 2,403 | 57.6% | 6.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in West Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Tyseley | 31,186 | 92.4% | 3.8% |
| Rugeley Trent Valley | 33,660 | 77.6% | 4.7% |
| Hereford | 33,709 | 74.1% | 3.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out