Bentley (Hampshire)
BTYSouth EastManaged by South Western Railway
How this station is performing
Bentley (Hampshire) had 17,827 scheduled stops to Period 7 of 2026-27, about 49 a day. 84.9% of recorded arrivals were within three minutes of the timetable and 3.3% of scheduled stops were cancelled.
The nearest stations to Bentley (Hampshire) are Farnham (6.3 km north-east), Alton (7.7 km south-west), Aldershot (10.5 km north-east), Winchfield (11.8 km north) and Fleet (12.5 km north). 2 stations lie within 10 km in all. Of the five, Aldershot is the most punctual at 90.7% and Fleet the least at 79.6%, with Bentley (Hampshire) on 84.9%.
Bentley (Hampshire) is named after Bentley, a Village, home to about 1,404 people, but the station stands 1.6 km from its centre.
Bentley (Hampshire) has slipped a little, from 89.8% within three minutes in the previous 13 periods to 84.9% in the latest 13, a fall of 4.9 percentage points. Cancellations rose to 3.3% of scheduled stops from 2.6%, which is 0.7 percentage points more.
Across the whole run of data, the weakest four-week period for Bentley (Hampshire) was Period 9 of 2023-24, at 73.7%, some time before the latest year. The strongest was Period 5 of 2023-24, at 96.7%, and the two are 23.0 percentage points apart. Cancellations peaked at 9.7% of scheduled stops in Period 1 of 2024-25, against 3.3% over the latest 13 periods.
1 of 3 stations of a similar size in South East are more punctual than Bentley (Hampshire) on 84.9%. The comparison group includes Newhaven Harbour (86.1%), Aldrington (83.7%) and Barming (80.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 17,827 | 84.9% | 3.3% |
Operators with their own page for this station are linked to it.
Late train at Bentley (Hampshire)? Delay Repay
These operators call at Bentley (Hampshire) and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,353 | 81.2% | 3.0% |
| Period 6 of 2026-27 | 1,245 | 81.6% | 2.4% |
| Period 5 of 2026-27 | 1,380 | 77.8% | 4.7% |
| Period 4 of 2026-27 | 1,356 | 77.1% | 2.5% |
| Period 3 of 2026-27 | 1,336 | 82.2% | 6.1% |
| Period 2 of 2026-27 | 1,380 | 83.0% | 9.1% |
| Period 1 of 2026-27 | 1,600 | 89.9% | 2.4% |
| Period 13 of 2025-26 | 1,511 | 92.2% | 1.1% |
| Period 12 of 2025-26 | 1,314 | 90.6% | 2.1% |
| Period 11 of 2025-26 | 1,375 | 91.6% | 0.4% |
| Period 10 of 2025-26 | 1,211 | 86.9% | 4.1% |
| Period 9 of 2025-26 | 1,382 | 84.0% | 2.0% |
| Period 8 of 2025-26 | 1,384 | 83.7% | 3.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Newhaven Harbour | 17,904 | 86.1% | 1.6% |
| Aldrington | 17,939 | 83.7% | 2.4% |
| Barming | 17,939 | 80.9% | 1.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out