Period 4 of 2026-27
Previous periodNext periodAll periods
How the period went
In Period 4 of 2026-27, 7,146,508 scheduled station stops were recorded across Great Britain. 82.5% of recorded arrivals came within three minutes of the timetable and 4.0% of scheduled stops were cancelled.
Compared with Period 3 of 2026-27, the biggest rises among stations with at least 1,500 scheduled stops were at Low Moor (up 8.9 points to 73.0%), Herne Bay (up 8.5 points to 78.9%), Whitstable (up 8.4 points to 77.4%), Birchington-on-Sea (up 7.5 points to 80.8%) and Urmston (up 7.1 points to 62.3%).
Compared with Period 3 of 2026-27, the biggest falls were at Royston (down 18.2 points to 55.4%), Baldock (down 16.8 points to 59.5%), Ashwell and Morden (down 16.1 points to 59.7%), Winchester (down 13.6 points to 53.3%) and Letchworth Garden City (down 13.5 points to 64.4%).
Against the same period a year earlier, Period 4 of 2026-27 brought the biggest improvements at Haslemere (up 17.5 points to 78.7%), Hornbeam Park (up 14.8 points to 81.6%), Harrogate (up 14.6 points to 80.4%) and Starbeck (up 14.6 points to 80.5%).
Against the same period a year earlier, Period 4 of 2026-27 brought the biggest drops at Waterbeach (down 24.9 points to 57.3%), Royston (down 22.1 points to 55.4%), Baldock (down 20.1 points to 59.5%) and Ashwell and Morden (down 20.1 points to 59.7%).
2 stations had their best figure on record in Period 4 of 2026-27; the busiest of them were Bromley North (99.8%) and Sundridge Park (99.8%).
53 stations had their worst figure on record in Period 4 of 2026-27; the busiest of them were London Euston (65.9%), Harrow and Wealdstone (80.6%), Birmingham International (58.5%), Stafford (47.4%) and Oxford (68.9%).
Least punctual stations
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Honiton | 1,006 | 40.4% | 4.6% |
| Crewkerne | 961 | 41.4% | 3.1% |
| Axminster | 1,005 | 41.9% | 4.4% |
| Yeovil Junction | 1,299 | 42.5% | 3.4% |
| Atherstone | 927 | 44.4% | 12.5% |
| Penkridge | 1,498 | 45.8% | 7.0% |
| Penrith (North Lakes) | 1,844 | 46.2% | 7.0% |
| Gillingham (Dorset) | 1,177 | 46.7% | 4.0% |
Most cancellations
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Waterbeach | 2,069 | 57.3% | 18.1% |
| Ashwell and Morden | 2,522 | 59.7% | 17.7% |
| Downham Market | 1,392 | 49.7% | 17.3% |
| Watlington | 1,392 | 49.9% | 17.3% |
| Littleport | 1,392 | 50.7% | 17.2% |
| Royston | 3,733 | 55.4% | 17.2% |
| Kings Lynn | 1,392 | 51.9% | 17.0% |
| Hackney Central | 8,256 | 76.9% | 16.8% |
Operators
| Operator | Within 3 min | Cancelled |
|---|---|---|
| c2c | 90.3% | 3.5% |
| Merseyrail | 89.7% | 1.8% |
| Greater Anglia | 89.5% | 2.3% |
| Elizabeth line | 89.2% | 2.5% |
| Heathrow Express | 89.0% | 1.4% |
| ScotRail | 88.3% | 2.3% |
| London Overground | 87.5% | 7.8% |
| Southeastern | 86.1% | 1.6% |
| Chiltern Railways | 84.2% | 1.5% |
| Transport for Wales | 83.1% | 4.0% |
| GTR | 82.0% | 5.2% |
| South Western Railway | 81.9% | 3.0% |
| Northern | 79.1% | 3.3% |
| West Midlands Railway | 76.6% | 5.5% |
| East Midlands Railway | 72.8% | 4.8% |
| Great Western Railway | 70.6% | 5.9% |
| TransPennine Express | 66.8% | 3.5% |
| LNER | 64.7% | 2.1% |
| CrossCountry | 55.8% | 6.0% |
| Avanti | 44.7% | 11.5% |
Areas
| Area | Within 3 min | Cancelled |
|---|---|---|
| Scotland | 87.8% | 2.3% |
| London | 87.1% | 4.6% |
| Wales | 84.0% | 3.9% |
| East of England | 83.5% | 4.6% |
| South East | 80.4% | 3.3% |
| North East | 79.9% | 2.8% |
| North West | 79.3% | 3.2% |
| Yorkshire and The Humber | 77.3% | 3.5% |
| East Midlands | 74.3% | 4.1% |
| West Midlands | 72.9% | 5.5% |
| South West | 66.5% | 6.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out