Gillingham (Dorset)
GILSouth WestManaged by South Western Railway
How this station is performing
Gillingham (Dorset) had 15,009 scheduled stops to Period 7 of 2026-27, about 41 a day. 62.7% of recorded arrivals were within three minutes of the timetable and 3.1% of scheduled stops were cancelled.
Gillingham (Dorset) opened on 2 May 1859, 167 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Bruton is the oldest (1856) and Sherborne the newest (1860), with Gillingham (Dorset) in between.
Gillingham (Dorset) is remote: its nearest neighbours are Templecombe (10.8 km west), Tisbury (13.9 km east), Bruton (15.0 km north-west), Castle Cary (19.0 km north-west) and Sherborne (19.6 km south-west). Of the five, Sherborne is the most punctual at 69.1% and Castle Cary the least at 57.2%, with Gillingham (Dorset) on 62.7%.
Gillingham (Dorset) is named after Gillingham, a town, home to about 11,505 people, but the station stands 0.4 km from its centre.
Gillingham (Dorset) has slipped sharply. 62.7% of stops came within three minutes of the timetable in the latest 13 periods, 6.0 percentage points worse than the 68.7% recorded in the 13 before. Cancellations rose to 3.1% of scheduled stops from 2.2%, which is 0.9 percentage points more.
Compared with 3 stations of a similar size in South West, Gillingham (Dorset) is the least punctual, at 62.7%. All of them are ahead, including Freshford (76.7%), Bedwyn (78.4%) and Moreton (Dorset) (75.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 15,009 | 62.7% | 3.1% |
Operators with their own page for this station are linked to it.
Late train at Gillingham (Dorset)? Delay Repay
These operators call at Gillingham (Dorset) and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,026 | 52.9% | 2.5% |
| Period 6 of 2026-27 | 1,050 | 57.7% | 1.5% |
| Period 5 of 2026-27 | 1,138 | 41.0% | 6.2% |
| Period 4 of 2026-27 | 1,177 | 46.7% | 4.0% |
| Period 3 of 2026-27 | 1,187 | 61.9% | 2.4% |
| Period 2 of 2026-27 | 1,202 | 57.1% | 3.2% |
| Period 1 of 2026-27 | 1,395 | 64.1% | 2.0% |
| Period 13 of 2025-26 | 1,363 | 72.9% | 2.7% |
| Period 12 of 2025-26 | 1,231 | 79.8% | 2.1% |
| Period 11 of 2025-26 | 1,137 | 58.7% | 3.8% |
| Period 10 of 2025-26 | 1,077 | 61.5% | 2.7% |
| Period 9 of 2025-26 | 1,054 | 73.5% | 2.5% |
| Period 8 of 2025-26 | 972 | 87.0% | 5.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Freshford | 14,997 | 76.7% | 4.8% |
| Bedwyn | 14,970 | 78.4% | 3.1% |
| Moreton (Dorset) | 14,908 | 75.2% | 4.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out