In Period 9 of 2024-25, 7,017,896 scheduled station stops were recorded across Great Britain. 77.4% of recorded arrivals came within three minutes of the timetable and 5.3% of scheduled stops were cancelled.
Compared with Period 8 of 2024-25, the biggest rises among stations with at least 1,500 scheduled stops were at Renton (up 17.9 points to 70.4%), Carntyne (up 14.2 points to 79.2%), Bearsden (up 11.0 points to 76.2%), Balloch (up 10.3 points to 75.3%) and Bowling (up 10.3 points to 75.3%).
Compared with Period 8 of 2024-25, the biggest falls were at Winchester (down 26.3 points to 45.4%), New Milton (down 23.6 points to 54.3%), Fulwell (down 22.5 points to 56.6%), Hamworthy (down 22.4 points to 51.4%) and Shepperton (down 21.9 points to 59.4%).
Against the same period a year earlier, Period 9 of 2024-25 brought the biggest improvements at Pengam (up 19.0 points to 69.2%), Brighouse (up 17.5 points to 75.0%), Huddersfield (up 16.6 points to 61.3%) and Wrexham General (up 15.6 points to 66.2%).
Against the same period a year earlier, Period 9 of 2024-25 brought the biggest drops at North Camp (down 23.1 points to 66.7%), Cardiff Bay (down 21.1 points to 78.5%), Shepperton (down 20.7 points to 59.4%) and Knockholt (down 19.8 points to 64.8%).
381 stations had their worst figure on record in Period 9 of 2024-25; the busiest of them were Clapham Junction (74.1%), London Bridge (73.9%), London Waterloo (67.5%), Farringdon (80.7%) and Birmingham New Street (58.5%).
Least punctual stations
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Honiton | 555 | 20.0% | 9.0% |
| Cranbrook (Devon) | 540 | 28.7% | 10.9% |
| Starbeck | 1,734 | 34.3% | 4.6% |
| Ravensthorpe | 642 | 37.1% | 4.7% |
| Knaresborough | 1,780 | 38.6% | 4.4% |
| Weeton | 1,989 | 39.5% | 5.5% |
| Hornbeam Park | 1,989 | 39.6% | 5.5% |
| Harrogate | 2,264 | 39.9% | 4.4% |
Most cancellations
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Dilton Marsh | 800 | – | 22.4% |
| Sutton Common | 1,892 | – | 17.5% |
| Morden South | 1,892 | – | 17.4% |
| South Merton | 1,892 | 80.8% | 17.4% |
| St Helier (London) | 1,892 | – | 17.4% |
| West Sutton | 1,892 | 81.2% | 17.4% |
| Wimbledon Chase | 1,892 | 79.2% | 17.3% |
| Haydons Road | 1,952 | 83.4% | 16.7% |
Operators
| Operator | Within 3 min | Cancelled |
|---|---|---|
| c2c | 93.1% | 0.7% |
| Greater Anglia | 90.7% | 2.3% |
| Merseyrail | 89.3% | 3.5% |
| London Overground | 87.1% | 4.6% |
| Elizabeth line | 86.5% | 6.2% |
| Chiltern Railways | 85.7% | 2.2% |
| ScotRail | 84.4% | 2.5% |
| Heathrow Express | 84.3% | 6.1% |
| GTR | 79.0% | 6.5% |
| Southeastern | 73.5% | 2.8% |
| West Midlands Railway | 73.5% | 6.7% |
| Transport for Wales | 72.8% | 8.0% |
| Great Western Railway | 70.1% | 8.3% |
| Northern | 69.5% | 7.0% |
| South Western Railway | 66.7% | 5.6% |
| East Midlands Railway | 66.4% | 4.7% |
| LNER | 61.5% | 3.5% |
| TransPennine Express | 60.8% | 4.0% |
| CrossCountry | 55.2% | 9.4% |
| Avanti | 48.9% | 6.9% |
Areas
| Area | Within 3 min | Cancelled |
|---|---|---|
| East of England | 84.2% | 4.3% |
| Scotland | 84.1% | 2.6% |
| London | 81.9% | 5.2% |
| North West | 75.9% | 6.2% |
| Wales | 73.2% | 8.4% |
| South East | 72.4% | 4.8% |
| North East | 72.3% | 5.9% |
| West Midlands | 70.2% | 6.7% |
| South West | 67.3% | 8.9% |
| East Midlands | 67.2% | 5.1% |
| Yorkshire and The Humber | 65.5% | 4.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out