Harrogate
HGTYorkshire and The HumberManaged by Northern Trains
How this station is performing
Harrogate had 31,553 scheduled stops to Period 7 of 2026-27, about 87 a day. 75.9% of recorded arrivals were within three minutes of the timetable and 3.1% of scheduled stops were cancelled.
Harrogate opened on 20 July 1848. It was moved to the site it uses now on 1 August 1862. Of the 5 stations nearest to it with a known opening date, Harrogate is the oldest; the next oldest, Starbeck, dates from 1848.
The nearest stations to Harrogate are Hornbeam Park (1.6 km south-east), Starbeck (2.5 km east), Pannal (3.9 km south), Knaresborough (4.7 km east) and Weeton (8.3 km south). 5 stations lie within 10 km in all. Of the five, Weeton is the most punctual at 78.0% and Knaresborough the least at 73.3%, with Harrogate on 75.9%.
Harrogate takes its name from a town called Harrogate, home to about 73,576 people, and the station stands 0.2 km from its centre.
2 operators call at Harrogate: Northern (74.2%, 87% of stops) and LNER (87.5%, 13% of stops). The operator you travel with matters: LNER reaches 87.5% within three minutes while Northern manages 74.2%, a gap of 13.3 percentage points.
1 of 3 stations of a similar size in Yorkshire and The Humber are more punctual than Harrogate on 75.9%. The comparison group includes Mirfield (73.3%), Horsforth (77.2%) and Northallerton (65.6%).
Period by period
Operators calling here
Operators with their own page for this station are linked to it.
Late train at Harrogate? Delay Repay
These operators call at Harrogate and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,383 | 76.6% | 2.3% |
| Period 6 of 2026-27 | 2,432 | 86.5% | 3.4% |
| Period 5 of 2026-27 | 2,447 | 83.6% | 3.1% |
| Period 4 of 2026-27 | 2,442 | 80.4% | 3.7% |
| Period 3 of 2026-27 | 2,448 | 81.3% | 5.8% |
| Period 2 of 2026-27 | 2,433 | 82.1% | 3.8% |
| Period 1 of 2026-27 | 2,808 | 87.0% | 3.7% |
| Period 13 of 2025-26 | 2,489 | 81.1% | 0.8% |
| Period 12 of 2025-26 | 2,393 | 77.8% | 2.0% |
| Period 11 of 2025-26 | 2,393 | 77.0% | 2.3% |
| Period 10 of 2025-26 | 2,175 | 66.1% | 2.6% |
| Period 9 of 2025-26 | 2,350 | 45.2% | 5.2% |
| Period 8 of 2025-26 | 2,360 | 56.8% | 1.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Mirfield | 31,735 | 73.3% | 2.3% |
| Horsforth | 32,010 | 77.2% | 3.4% |
| Northallerton | 30,869 | 65.6% | 2.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out