Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Period 7 of 2024-25

Previous periodNext periodAll periods

On time, nationally83.5%A year earlier: 84.4%
Cancelled, nationally3.9%A year earlier: 3.0%
Scheduled stops6,850,591Across Great Britain

How the period went

In Period 7 of 2024-25, 6,850,591 scheduled station stops were recorded across Great Britain. 83.5% of recorded arrivals came within three minutes of the timetable and 3.9% of scheduled stops were cancelled.

Compared with Period 6 of 2024-25, the biggest rises among stations with at least 1,500 scheduled stops were at Thetford (up 6.7 points to 79.7%), Christs Hospital (up 6.2 points to 81.2%), Windsor and Eton Riverside (up 5.8 points to 90.9%), Bracknell (up 5.5 points to 86.4%) and Billingshurst (up 5.4 points to 81.1%).

Compared with Period 6 of 2024-25, the biggest falls were at Longbridge (down 12.6 points to 67.1%), Macclesfield (down 12.4 points to 51.5%), Redditch (down 12.2 points to 69.7%), Worle (down 12.0 points to 64.1%) and Barnt Green (down 11.8 points to 71.7%).

Against the same period a year earlier, Period 7 of 2024-25 brought the biggest improvements at Sydenham Hill (up 13.4 points to 87.1%), Bank Hall (up 12.6 points to 97.8%), Penge East (up 12.5 points to 87.2%) and Birkdale (up 11.4 points to 96.2%).

Against the same period a year earlier, Period 7 of 2024-25 brought the biggest drops at Arbroath (down 18.0 points to 57.7%), Radlett (down 17.0 points to 69.8%), Elstree and Borehamwood (down 16.7 points to 69.3%) and Mill Hill Broadway (down 16.2 points to 69.5%).

15 stations had their best figure on record in Period 7 of 2024-25; the busiest of them were Bank Hall (97.8%), Blundellsands and Crosby (96.4%), Bootle New Strand (97.6%), Bootle Oriel Road (97.5%) and Formby (97.1%).

4 stations had their worst figure on record in Period 7 of 2024-25; the busiest of them were Streatham Common (91.6%), Gerrards Cross (85.1%), Epsom Downs (89.3%) and Denham (84.9%).

Least punctual stations

StationScheduled stopsWithin 3 minCancelled
Honiton91639.4%4.6%
Ravensthorpe97645.4%1.7%
Yeovil Junction1,31745.4%3.3%
Axminster1,05446.9%3.6%
Moses Gate83948.6%8.2%
Kingussie64349.1%0.6%
Feniton59649.2%5.5%
Whimple60049.2%5.3%

Most cancellations

StationScheduled stopsWithin 3 minCancelled
Ledbury1,01074.7%16.7%
Ifield2,03778.2%16.6%
Littlehaven2,13777.0%15.9%
Longbeck1,67486.0%14.9%
Marske1,67488.4%14.9%
Redcar East1,67485.7%14.9%
Colwall1,01074.7%14.0%
Ashwell and Morden2,54775.7%13.8%

Operators

OperatorWithin 3 minCancelled
c2c93.7%1.2%
Merseyrail93.6%1.8%
Greater Anglia92.9%2.5%
London Overground91.1%3.2%
Elizabeth line90.4%2.4%
ScotRail89.5%1.2%
Heathrow Express88.1%4.6%
Chiltern Railways85.6%4.7%
Southeastern83.4%2.0%
GTR83.2%6.4%
South Western Railway83.1%3.5%
West Midlands Railway80.1%5.9%
Transport for Wales79.0%3.4%
Northern75.7%6.2%
Great Western Railway75.0%4.4%
East Midlands Railway73.5%2.9%
LNER71.8%3.6%
TransPennine Express66.8%3.0%
CrossCountry63.7%3.4%
Avanti60.6%5.1%

Areas

AreaWithin 3 minCancelled
Scotland89.1%1.3%
London88.0%3.7%
East of England87.1%4.6%
South East81.9%3.7%
North West80.6%4.5%
Wales79.3%3.4%
North East77.0%9.4%
West Midlands77.0%5.6%
East Midlands75.0%3.1%
Yorkshire and The Humber73.9%4.1%
South West72.2%5.0%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out