Feniton
FNTSouth WestManaged by South Western Railway
How this station is performing
Feniton had 8,255 scheduled stops to Period 7 of 2026-27, about 23 a day. 66.7% of recorded arrivals were within three minutes of the timetable and 3.9% of scheduled stops were cancelled.
Feniton opened on 19 July 1860 and closed to passengers on 6 March 1967. It reopened on 3 May 1971, 55 years before the latest figures. Of the 5 stations nearest to it with a known opening date, Feniton is the oldest; the next oldest, Whimple, dates from 1860.
The nearest stations to Feniton are Whimple (5.3 km south-west), Honiton (7.0 km east), Cranbrook (Devon) (10.4 km south-west), Pinhoe (14.1 km south-west) and Tiverton Parkway (15.4 km north). 2 stations lie within 10 km in all. Of the five, Pinhoe is the most punctual at 71.0% and Tiverton Parkway the least at 57.1%, with Feniton on 66.7%.
Feniton takes its name from a Village called Feniton, home to about 2,006 people, and the station stands 0.2 km from its centre.
Across the whole run of data, the weakest four-week period for Feniton was Period 9 of 2024-25, at 27.8%, some time before the latest year. The strongest was Period 7 of 2025-26, at 88.5%, and the two are 60.7 percentage points apart. Cancellations peaked at 11.4% of scheduled stops in Period 1 of 2023-24, against 3.9% over the latest 13 periods.
Compared with 3 stations of a similar size in South West, Feniton is the least punctual, at 66.7%. All of them are ahead, including Lelant (94.9%), Whimple (70.2%) and Bruton (68.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 7,916 | 67.2% | 2.7% |
| Great Western Railway | 339 | – | – |
Operators with their own page for this station are linked to it.
Late train at Feniton? Delay Repay
These operators call at Feniton and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 565 | 75.7% | 3.9% |
| Period 6 of 2026-27 | 562 | 72.9% | 3.6% |
| Period 5 of 2026-27 | 620 | 51.2% | 5.5% |
| Period 4 of 2026-27 | 660 | 48.2% | 6.4% |
| Period 3 of 2026-27 | 697 | 62.1% | 4.2% |
| Period 2 of 2026-27 | 677 | 62.0% | 4.7% |
| Period 1 of 2026-27 | 737 | 62.3% | 2.8% |
| Period 13 of 2025-26 | 699 | 71.4% | 2.4% |
| Period 12 of 2025-26 | 635 | 77.5% | 2.8% |
| Period 11 of 2025-26 | 610 | 66.6% | 4.4% |
| Period 10 of 2025-26 | 611 | 70.0% | 3.9% |
| Period 9 of 2025-26 | 599 | 69.6% | 1.5% |
| Period 8 of 2025-26 | 583 | 80.4% | 5.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out