Period 3 of 2023-24
Previous periodNext periodAll periods
How the period went
In Period 3 of 2023-24, 6,382,570 scheduled station stops were recorded across Great Britain. 84.9% of recorded arrivals came within three minutes of the timetable and 3.3% of scheduled stops were cancelled.
Compared with Period 2 of 2023-24, the biggest rises among stations with at least 1,500 scheduled stops were at Nailsea and Backwell (up 10.6 points to 74.8%), Yatton (up 10.0 points to 72.9%), Small Heath (up 7.0 points to 92.7%), Hagley (up 6.9 points to 89.1%) and Tyseley (up 6.5 points to 94.2%).
Compared with Period 2 of 2023-24, the biggest falls were at Coleshill Parkway (down 16.6 points to 59.2%), Great Malvern (down 15.6 points to 63.4%), City Thameslink (down 13.7 points to 71.0%), Malvern Link (down 13.2 points to 68.9%) and Tamworth (down 12.8 points to 57.0%).
3 stations had their best figure on record in Period 3 of 2023-24; the busiest of them were Falmer (96.6%), Rice Lane (97.1%) and London Road (Brighton) (96.9%).
10 stations had their worst figure on record in Period 3 of 2023-24; the busiest of them were Barry (69.0%), Cogan (69.9%), Dinas Powys (67.1%), Trefforest (74.3%) and Barry Island (73.7%).
Among the 20 larger operators in Period 3 of 2023-24, Merseyrail was the most punctual at 93.3% and Avanti the least at 56.7%, which are 36.6 percentage points apart.
Least punctual stations
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Neston | 689 | 34.3% | 13.4% |
| Penyffordd | 689 | 36.5% | 13.4% |
| Gwersyllt | 689 | 37.5% | 13.4% |
| Leominster | 1,103 | 39.0% | 3.6% |
| Upton (Merseyside) | 690 | 39.0% | 13.3% |
| Buckley | 689 | 39.9% | 13.4% |
| Heswall | 689 | 40.3% | 13.4% |
| Hawarden | 689 | 40.8% | 13.5% |
Most cancellations
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Birchgrove | 1,321 | – | 22.6% |
| Rhiwbina | 1,321 | – | 22.6% |
| Whitchurch (Cardiff) | 1,321 | – | 22.6% |
| Coryton | 1,321 | 89.0% | 21.9% |
| Ty Glas | 1,321 | – | 21.4% |
| Heath Low Level | 1,321 | – | 20.9% |
| Wrexham Central | 678 | 46.7% | 18.1% |
| Kenilworth | 860 | 90.5% | 17.9% |
Operators
| Operator | Within 3 min | Cancelled |
|---|---|---|
| Merseyrail | 93.3% | 1.4% |
| Greater Anglia | 93.2% | 1.8% |
| London Overground | 92.6% | 2.4% |
| c2c | 91.0% | 1.2% |
| Chiltern Railways | 90.4% | 0.8% |
| ScotRail | 89.9% | 2.2% |
| Elizabeth line | 89.7% | 3.8% |
| Heathrow Express | 89.3% | 1.4% |
| South Western Railway | 87.0% | 2.7% |
| Southeastern | 86.0% | 1.8% |
| GTR | 83.7% | 4.5% |
| West Midlands Railway | 79.3% | 3.6% |
| Northern | 79.0% | 4.7% |
| Great Western Railway | 76.6% | 3.2% |
| LNER | 71.9% | 2.1% |
| Transport for Wales | 70.7% | 7.0% |
| East Midlands Railway | 69.8% | 2.6% |
| TransPennine Express | 68.6% | 5.5% |
| CrossCountry | 64.4% | 6.8% |
| Avanti | 56.7% | 4.7% |
Areas
| Area | Within 3 min | Cancelled |
|---|---|---|
| Scotland | 89.6% | 2.3% |
| London | 89.3% | 2.9% |
| East of England | 87.0% | 3.0% |
| South East | 83.8% | 3.2% |
| North West | 83.2% | 3.3% |
| North East | 78.4% | 5.0% |
| West Midlands | 77.2% | 3.4% |
| Yorkshire and The Humber | 75.6% | 4.6% |
| South West | 74.6% | 3.7% |
| East Midlands | 73.5% | 3.2% |
| Wales | 71.7% | 7.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out