Heath Low Level
HLLWalesManaged by TfW Rail
How this station is performing
Heath Low Level had 21,667 scheduled stops to Period 7 of 2026-27, about 60 a day. 94.2% of recorded arrivals were within three minutes of the timetable and 2.8% of scheduled stops were cancelled.
Heath Low Level opened on 1 March 1911, 115 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Llanishen is the oldest (1871) and Ty Glas the newest (1987), with Heath Low Level in between.
The nearest stations to Heath Low Level are Heath High Level (0.1 km north), Ty Glas (1.2 km north-west), Birchgrove (1.5 km north-west), Llanishen (1.9 km north) and Rhiwbina (2.3 km west). 29 stations lie within 10 km in all. Of the five, Birchgrove is the most punctual at 96.2% and Llanishen the least at 92.4%, with Heath Low Level on 94.2%.
Heath Low Level is named after Heath, a suburb, home to about 12,629 people, but the station stands 1.3 km from its centre.
Compared with 3 stations of a similar size in Wales, Heath Low Level is the least punctual, at 94.2%. All of them are ahead, including Coryton (95.8%), Merthyr Vale (96.0%) and Pentre-Bach (97.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 21,667 | 94.2% | 2.8% |
Operators with their own page for this station are linked to it.
Late train at Heath Low Level? Delay Repay
These operators call at Heath Low Level and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,702 | 91.8% | 3.2% |
| Period 6 of 2026-27 | 1,693 | 91.3% | 1.9% |
| Period 5 of 2026-27 | 1,604 | 93.0% | 2.9% |
| Period 4 of 2026-27 | 1,633 | 92.3% | 2.9% |
| Period 3 of 2026-27 | 1,671 | 95.9% | 2.5% |
| Period 2 of 2026-27 | 1,577 | 95.4% | 6.2% |
| Period 1 of 2026-27 | 1,952 | 93.5% | 3.8% |
| Period 13 of 2025-26 | 1,830 | 97.0% | 0.8% |
| Period 12 of 2025-26 | 1,694 | 96.5% | 1.1% |
| Period 11 of 2025-26 | 1,657 | 96.5% | 1.8% |
| Period 10 of 2025-26 | 1,470 | 95.0% | 2.6% |
| Period 9 of 2025-26 | 1,592 | 94.1% | 4.0% |
| Period 8 of 2025-26 | 1,592 | 90.6% | 2.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Coryton | 21,673 | 95.8% | 3.5% |
| Merthyr Vale | 21,675 | 96.0% | 1.8% |
| Pentre-Bach | 21,675 | 97.2% | 2.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out