Lapworth
LPWWest MidlandsManaged by Chiltern Railways
How this station is performing
Lapworth had 14,179 scheduled stops to Period 7 of 2026-27, about 39 a day. 85.5% of recorded arrivals were within three minutes of the timetable and 3.3% of scheduled stops were cancelled.
Lapworth opened on 1 October 1852, 174 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Lapworth is the oldest; the next oldest, Dorridge, dates from 1852.
The nearest stations to Lapworth are Dorridge (3.8 km north-west), Hatton (6.3 km south-east), Danzey (6.7 km west), Henley-in-Arden (6.9 km south-west) and Widney Manor (6.9 km north-west). 14 stations lie within 10 km in all. Of the five, Widney Manor is the most punctual at 90.1% and Henley-in-Arden the least at 84.9%, with Lapworth on 85.5%.
Lapworth takes its name from a Village called Lapworth, home to about 1,916 people, and the station stands 1.6 km from its centre.
2 operators call at Lapworth: West Midlands Railway (87.6%, 61% of stops) and Chiltern Railways (82.4%, 39% of stops). The operator you travel with matters: West Midlands Railway reaches 87.6% within three minutes while Chiltern Railways manages 82.4%, a gap of 5.2 percentage points.
Compared with 3 stations of a similar size in West Midlands, Lapworth is the most punctual, at 85.5%. The comparison group includes Colwall (71.3%), Ledbury (71.2%) and Codsall (73.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 8,680 | 87.6% | 4.7% |
| Chiltern Railways | 5,499 | 82.4% | 1.3% |
Operators with their own page for this station are linked to it.
Late train at Lapworth? Delay Repay
These operators call at Lapworth and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,121 | 80.3% | 1.5% |
| Period 6 of 2026-27 | 1,139 | 81.7% | 2.9% |
| Period 5 of 2026-27 | 945 | 80.0% | 6.2% |
| Period 4 of 2026-27 | 1,074 | 79.3% | 5.0% |
| Period 3 of 2026-27 | 1,037 | 82.5% | 2.9% |
| Period 2 of 2026-27 | 1,067 | 83.5% | 2.3% |
| Period 1 of 2026-27 | 1,219 | 89.8% | 3.0% |
| Period 13 of 2025-26 | 1,240 | 90.4% | 3.4% |
| Period 12 of 2025-26 | 1,136 | 92.2% | 2.0% |
| Period 11 of 2025-26 | 1,055 | 91.2% | 2.7% |
| Period 10 of 2025-26 | 904 | 89.1% | 3.9% |
| Period 9 of 2025-26 | 1,154 | 86.3% | 3.1% |
| Period 8 of 2025-26 | 1,088 | 83.8% | 5.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in West Midlands
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out