Beaconsfield
BCFSouth EastManaged by Chiltern Railways
How this station is performing
Beaconsfield had 38,516 scheduled stops to Period 7 of 2026-27, about 106 a day. 89.5% of recorded arrivals were within three minutes of the timetable and 1.4% of scheduled stops were cancelled.
Beaconsfield opened on 2 April 1906, 120 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Bourne End is the oldest (1854) and Seer Green and Jordans the newest (1914), with Beaconsfield in between.
The nearest stations to Beaconsfield are Seer Green and Jordans (2.5 km east), Bourne End (6.0 km south-west), Gerrards Cross (6.6 km east), High Wycombe (7.3 km west) and Amersham (7.4 km north). 11 stations lie within 10 km in all. Of the five, Bourne End is the most punctual at 92.6% and Amersham the least at 85.7%, with Beaconsfield on 89.5%.
Beaconsfield takes its name from a market town called Beaconsfield, home to about 12,235 people, and the station stands 1.3 km from its centre.
In South East, Beaconsfield ranks 61st of 409 ranked stations. Its 89.5% is 8.3 percentage points better than the area median of 81.2%.
1 of 3 stations of a similar size in South East are more punctual than Beaconsfield on 89.5%. The comparison group includes Dorking (Main) (87.4%), Effingham Junction (85.0%) and Ewell East (91.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Chiltern Railways | 38,516 | 89.5% | 1.4% |
Operators with their own page for this station are linked to it.
Late train at Beaconsfield? Delay Repay
These operators call at Beaconsfield and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,970 | 88.1% | 1.0% |
| Period 6 of 2026-27 | 2,792 | 85.7% | 1.0% |
| Period 5 of 2026-27 | 2,994 | 85.6% | 2.1% |
| Period 4 of 2026-27 | 3,007 | 86.2% | 1.4% |
| Period 3 of 2026-27 | 2,786 | 87.5% | 1.8% |
| Period 2 of 2026-27 | 2,979 | 89.2% | 1.2% |
| Period 1 of 2026-27 | 3,433 | 92.4% | 1.0% |
| Period 13 of 2025-26 | 3,156 | 93.3% | 2.2% |
| Period 12 of 2025-26 | 2,955 | 93.2% | 0.5% |
| Period 11 of 2025-26 | 2,848 | 92.2% | 1.1% |
| Period 10 of 2025-26 | 2,767 | 90.8% | 0.7% |
| Period 9 of 2025-26 | 2,895 | 88.3% | 3.4% |
| Period 8 of 2025-26 | 2,934 | 89.7% | 1.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Dorking (Main) | 38,418 | 87.4% | 3.0% |
| Effingham Junction | 38,383 | 85.0% | 2.8% |
| Ewell East | 38,268 | 91.7% | 2.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out